2-Cycle Snow Engine
Section 5 - Engine Assembly
Page 26
3. Torque flywheel nut to
33 lb-ft. (44.7 Nm)
.
4. Rotate flywheel so that magnet is away from coil
mounting area.
5. Install ignition coil and push ignition coil towards
cylinder head as far as it will go then temporarily
tighten one screw.
6. Rotate flywheel until magnet is under coil
laminations.
7. Place thickness gauge
.010” (0.25mm)
between magnet and coil laminations (Figure 75).
Fig. 75
8. Loosen mounting screw so magnet will pull
ignition coil down against thickness gauge.
Torque screws to
90 lb-in. (10.0 Nm)
.
9. Rotate flywheel to remove thickness gauge.
10. Install ground wire assembly to ignition coil.
Route wire between cylinder head fins as shown
(Figure 76).
Fig. 76
INSTALL AIR VANE AND GOVERNOR
1. Install air vane governor bracket to cylinder
(Figure 77).
a. Torque screw
to
30 lb-in. (3.0 Nm)
.
Fig. 77
2. Assemble governor link to lever on air vane from
the back side as shown (
Figure 78).
3. Insert air vane into boss in governor bracket until
retainer snaps over boss on governor bracket.
Check that air vane pivots freely.
Fig. 78
Summary of Contents for 276535
Page 1: ...2 Cycle Snow Engine 0 2 CYCLE SNOW ENGINE REPAIR MANUAL MANUAL NUMBER 276535...
Page 3: ...2 Cycle Snow Engine ii...
Page 4: ...2 Cycle Snow Engine iii...
Page 14: ...2 Cycle Snow Engine Section 2 Troubleshooting Page 8...
Page 38: ...2 Cycle Snow Engine Section 6 Final Adjustments Specifications Page 32...