![Bridgeview Bale King 6100 Operator'S & Parts Manual Download Page 19](http://html.mh-extra.com/html/bridgeview/bale-king-6100/bale-king-6100_operators-and-parts-manual_2810289019.webp)
Bale King 6100 – Operator and Parts Manual
19 / 65
Loading deck
The Bale King 6100 can carry 5
bales on the deck and 1 bale
inside the tub. It is equipped
with a pair of heavy duty
conveyor chains to load
bales. Set the flow rate on
the tractor for the desired
loading speed.
Torflex axles
The Bale King is equipped with
a pair of Torflex axles that
allow a smooth ride over
rough terrain. .
Safety Operation
Power and take off Use
Prior to first use of the Bale King, the PTO connectors and shaft length must be
adjusted to your tractor.
Length
Confirm the minimum and maximum working lengths of the
drive-line. The telescoping tubes must overlap at least 1/3
of their length when in use. The PTO is designed to be
used with a drawbar length of 16" from the end of the PTO
shaft. Adjust your tractor accordingly.
Shielding
Be sure that the shielding is not damaged
and rotates freely on the drive shaft.
Summary of Contents for Bale King 6100
Page 40: ...Bale King 6100 Operator and Parts Manual 40 65 Gearbox Assembly ...
Page 50: ...Bale King 6100 Operator and Parts Manual 50 65 Main deck ...
Page 56: ...Bale King 6100 Operator and Parts Manual 56 65 Decal ...
Page 58: ...Bale King 6100 Operator and Parts Manual 58 65 Hydraulics Wiring Diagram ...
Page 59: ...Bale King 6100 Operator and Parts Manual 59 65 Chain Motor ...
Page 60: ...Bale King 6100 Operator and Parts Manual 60 65 Tilt Fork Deflector ...
Page 61: ...Bale King 6100 Operator and Parts Manual 61 65 Light Diagram ...
Page 62: ...Bale King 6100 Operator and Parts Manual 62 65 Diverter Diagram Machine side ...
Page 63: ...Bale King 6100 Operator and Parts Manual 63 65 Tractor Side Control Box 23988 ...