background image

24 Armstrong AVE
Georgetown L7G 3R9

1-877-260-4309

www.brc.group

Emotion

1 of 8

BOM

1

2

H

A - Upper frame - A
      x2

B - Upper frame - B

      x2

C - Upper frame - End

      x2

D1 - Spanner bars

        x2

D2 - Set Screws

        x4

E - Adjustable leg

      x2

F - Feet with levelers

     x2

G - Insert

      x12

H - M6x15 Hex screw

      x12

I - M6x15 Hex bolt

      x8

J - #10x3/4" pan head screw
     (9200818) x18

K - Worksurface

      x1

L - Wire Clips

     x10

M - #6x5/8 flat head phillip

      screw 

x10

N - #5x3/4 pan head phillip

      screw

x3

O - #8x5/8 pan head phillip

      screw

x2

P - Wire bascket

x1

E

C

A

B

G

Note: Direction

arrow towards
worksurface

Note: Direction
arrow towards

worksurface

Alta Assembly Guide

Summary of Contents for ALTA V2

Page 1: ...able leg x2 F Feet with levelers x2 G Insert x12 H M6x15 Hex screw x12 I M6x15 Hex bolt x8 J 10x3 4 pan head screw 9200818 x18 K Worksurface x1 L Wire Clips x10 M 6x5 8 flat head phillip screw x10 N 5x3 4 pan head phillip screw x3 O 8x5 8 pan head phillip screw x2 P Wire bascket x1 E C A B G Note Direction arrow towards worksurface Note Direction arrow towards worksurface Alta Assembly Guide ...

Page 2: ...24 Armstrong AVE Georgetown L7G 3R9 1 877 260 4309 www brc group Emotion 3 K 2 of 8 C 5 4 L C L Note Position Table Frame to on the center of the Worksurface D1 Alta Assembly Guide ...

Page 3: ...24 Armstrong AVE Georgetown L7G 3R9 1 877 260 4309 www brc group Emotion 8 3 of 8 6 7 J D2 G I Alta Assembly Guide ...

Page 4: ...G 3R9 1 877 260 4309 www brc group Emotion 4 of 8 10a 9a Note Please follow sequence as shown to connect wires Switch install on RHS shown Flip Table and level by adjusting levelers Switch Plug Switch Plug Switch Alta Assembly Guide ...

Page 5: ...24 Armstrong AVE Georgetown L7G 3R9 1 877 260 4309 www brc group Emotion 5 of 8 11a Alta Assembly Guide ...

Page 6: ...G 3R9 1 877 260 4309 www brc group Emotion 6 of 8 10b 9b Note Please follow sequence as shown to connect wires Switch install on LHS shown Flip Table and level by adjusting levelers Switch Plug Switch Plug Switch Alta Assembly Guide ...

Page 7: ...24 Armstrong AVE Georgetown L7G 3R9 1 877 260 4309 www brc group Emotion 7 of 8 11b J P L M Alta Assembly Guide ...

Page 8: ...upplied to Table Please contact your supplier After Connecting the power press and hold up down together the legs have no response Note testing sequence should include the initialization sequence prior to usage Solution 1 Solution 2 Solution 3 Check if the connection is correct Verify power is supplied to table Please contact your supplier The legs rising slowly Check if the input power is correct...

Reviews: