
NANOSYSTEM
FABRICATION FACILITY (NFF), HKUST
Version 1.0
Page 10 of 14
5. The quartz boats, thermal couple and chamber are under good conditions and
without cracks.
6. The sealing surface and the sealing rubber of the door are under good
conditions without damage.
4.5 Status Checks
No reservation is needed for this equipment. The equipment is under “first come
first serve” basis.
4.6 Steps to Operate The Equipment
4.6.1 Load the wafers or specimens into the chamber
1. Put the wafers or specimens into suitable quartz boats. The quartz boats are
located on top of the main unit.
2. Make sure the chamber is vented.
3. If the door is locked, pull the knob and turn it in clockwise direction. Unlock
and open the chamber door.
4. Use the metal fork to load the boats into the chamber.
5. Put the boats in the center position of the chamber. Don’t damage the thermal
couple which is located at the left of the chamber.
6. Close the door, turn the knob in anti-clockwise direction and push the knob to
lock the chamber door.
4.6.2 Select recipe and run the process
1. In AllWin21 operation interface, go to “Process for Engineering menu”.