LVSD2
Installation
12
9/1/2022
Bradley
• 215-1829 Rev. E: ECO 22-08-005
Assemble and attach the
access panel hook as shown.
A
Access Panel – Fold-Up Option
7a
Make all connections before installing access panel.
#10-24
Flat Head
Screw
(160-520)
Finishing
Washer
(142-002CA)
Hang the access panel
onto the center hook.
B
Pivot the access panel onto the bowl
and secure the access panel to the
bowl gussets using the screws and
finishing washers provided (2 locations).
C
Secure the access panel to the
bowl using the screw and finishing
washer provided (2 locations).
D
Secure the access panel
to the wall using screws
provided by installer
(2 locations).
E
Access Panel – Swing-Down Option
7b
Make all connections before installing access panel.
Attach the access panel brackets to
the wall (refer to rough-in drawing)
by installing the #10 top screws
(supplied by installer) into the
slotted holes.
Do not install the
#10 bottom screws at this time.
A
Insert the #10 thumb screws into
front bowl apron. Thumb screw
in the vertical position is closed.
Thumb screw in the horizontal
position is open.
B
After access panel brackets are
properly adjusted, mark location
and install the #10 bottom screws
to secure the brackets in place.
D
Hang access panel onto the
mounting brackets attached to the
wall, on the left and right sides.
Rotate panel up and check fitup
between thumb screws and panel
slots. Route the access panel
down and adjust the access panel
brackets if necessary.
C
Shown in closed position.
Rotate 90° to Open.
#10
Thumb
Screw