Installation 

S19-323, S19-324

Bradley • 

215-1846 Rev. C; ECN 17-05-068 

11/21/2017

Servicing of Lights

S19-324 Halogen Lights (Type 4X)

A

De-power the control box by 
observing standard lock-out tag-out 
practices .

B

To disconnect the wire leads of the 
light requiring the bulb to be replaced, 
use a small blade screwdriver to 
depress the orange terminal release 
tab adjacent to the wire's location . 
With the tab fully depressed, the 
wire can be easily removed from the 
terminal location .

C

Remove the nut on the stem of 
the light which attaches it to the 
enclosure . Remove the entire light .

D

Remove the gasket (if present) to 
expose the four screws which retain 
the dome .

E

Remove the screws, take off the 
dome and the twist lock bulb is now 
visible . Press and turn the bulb to 
remove . Replace as needed with the 
same size bulb .

F

Reverse the disassemble process to 
reinstall the light . Inspect all gaskets 
and seals to ensure the integrity of 
the unit .

G

Check that the signaling station is 
functioning properly once the power 
is restored by activating the fixture 
attached to the signaling station .

S19-323 Signal Light (Type 3R)

A

De-power the control box by 
observing standard lock-out tag-out 
practices .

B

To disconnect the wire leads of the 
light requiring replacement, use a 
small blade screwdriver to depress 
the orange terminal release tab 
adjacent to the wire's location . With 
the tab fully depressed, the wire can 
be easily removed from the terminal 
location .

C

Remove the 2 nuts on the studs 
which attach the light to the enclosure 
and remove light . This is a sealed 
light and has no serviceable 
components, the complete housing 
must be replaced .

D

Using the old light for reference, 
prepare the replacement light's 
lead wire and exposed conductor's 
lengths .

E

Reverse the disassemble process to 
reinstall the lamp . Be sure to use the 
new gasket provided with the new 
light .

F

Check that the signaling station is 
functioning properly once the power 
is restored by activating the fixture 
attached to the signaling station .

Summary of Contents for S19-323

Page 1: ...EMA 4X Emergency Signaling System Table of Contents Pre Installation Information 2 3 Components 4 5 Install Flow Switch and Mount Assembly 6 Connect Signaling Assembly to Flow Switch 7 Complete Electr...

Page 2: ...e beginning installation and after installation is complete Test the unit for leaks and adequate water flow Main water supply should be ON at all times unless system is being serviced Provisions shall...

Page 3: ...gency fixtures require a minimum of 30 PSI 0 21MPa flowing pressure Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any...

Page 4: ...1mm NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 3R Junction Box and Cover Electrical Quick Disconnect Male 3 76mm 4 11 16 119mm Red Blue Black Remote Sensing 12 3 8 315mm System is pr...

Page 5: ...10 9 16 269mm Beacon Light Type 4X Shown Optional NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 4X Junction Box and Cover Electrical Quick Disconnect Male 3 5 16 84mm Red Blue Black Rem...

Page 6: ...nections C Choose a location for mounting the alarm For best visibility the signaling system should be mounted at least 7 above ground level The signaling system may be mounted directly to the drench...

Page 7: ...option determine mounting location of selector switch and size flexible cable length accordingly Hook up the wires from the provided flexible cable to control board see wiring diagram while the cover...

Page 8: ...flow will automatically reset the silence feature The alarm signaling system is designed to work properly even if both the eyewash and drench shower are used simultaneously The alarm will continue to...

Page 9: ...ensure the integrity of the unit G Check that the signaling station is functioning properly once the power is restored by activating the fixture attached to the signaling station S19 323 Signal Light...

Page 10: ...Component failure Check light connections and filament in the light Area light does not operate No power to the signal station Check that the circuit breaker or fuse is supplying power to the signal...

Page 11: ...ket Alarm Box GA 61 S90 634 1 General Area Hardware Kit Item Part No Qty Description 80 269 1421 1 Flowswitch 1 1 4 T DPDT 80 269 1522 1 Flowswitch 1 2 T DPDT 81 269 1902 1 Junction Box Conduit Outlet...

Page 12: ...T 32 269 1316 1 Conduit Nipple 3 4 x 6 33 169 1145 1 Elbow Pulling Conduit Item Part No Qty Description 34 269 2156 1 Close Nipple 3 4 Conduit 36 269 2460 Plug 3 4 Conduit NEMA 41 229 010 1 Selector S...

Page 13: ...C ECN 17 05 068 11 21 2017 Wiring Diagram NOTES 1 Devices in dashed boxes are optional 2 All powered devices are 24VDC 3 All wires are 18 AWG unless supplied with the device then those wires are to be...

Page 14: ...ELAY COIL NORMALLY OPEN NORMALLY CLOSED LIGHT HORN FLOW SWITCH FLOW SENSOR COMPONENT SOLDERED WIRE LEGEND CONTACT CONTACT INTERNAL JUMPER TERMINAL BLOCK CONNECTION NORMALLY OPEN CONNECTION NORMALLY CL...

Reviews: