background image

4

S19-323, S19-324

 Installation

6/11/2020 

Bradley • 

215-1846 Rev. G: ECO 20-05-028

S19-323 Components

Signal Light 

Type-3R Shown 

(Standard)

10-3/4" 

(273mm)

3-3/8" 

(86mm)

5-1/2" 

(140mm)

7-5/16" 

(185mm)

13-13/16" 

(351mm)

¾" NPT Hub, 

Plugged

Brass 

Sensor 

Body

Brass 

Adapter 

and Tee

NEMA 3R 

Junction Box 

and Cover

Electrical Quick 

Disconnect Male

3" (76mm)

4-11/16" 

(119mm)

Red

Blue

Black

Remote 

Sensing

12-3/8" 

(315mm)

System is prewired. Installer connects 
ONLY ground black and white wires.

2-7/8" 

(73mm)

1-5/8" 

(41mm)

1/2" (eyewash)

or 1-1/4" (drench 

shower) NPT Inlet 

and Outlet

2-3/8" (60mm) for 

eyewash or  

3-9/16" (91mm) for 

drench shower

Summary of Contents for NEMA 3R

Page 1: ...MA 3R S19 324 NEMA 4X Emergency Signaling System Table of Contents Pre Installation Information 2 3 Components 4 5 Install Flow Switch and Mount Assembly 6 Connect Signaling Assembly to Flow Switch 7...

Page 2: ...e beginning installation and after installation is complete Test the unit for leaks and adequate water flow Main water supply should be ON at all times unless system is being serviced Provisions shall...

Page 3: ...res require a minimum of 30 PSI 0 21MPa flowing pressure Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable flushing fluid supply is present and any sediment b...

Page 4: ...1mm NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 3R Junction Box and Cover Electrical Quick Disconnect Male 3 76mm 4 11 16 119mm Red Blue Black Remote Sensing 12 3 8 315mm System is pr...

Page 5: ...0 9 16 269mm Beacon Light Type 4X Shown Optional NPT Hub Plugged Brass Sensor Body Brass Adapter and Tee NEMA 4X Junction Box and Cover Electrical Quick Disconnect Male 3 5 16 84mm Red Blue Black Remo...

Page 6: ...nections C Choose a location for mounting the alarm For best visibility the signaling system should be mounted at least 7 above ground level The signaling system may be mounted directly to the drench...

Page 7: ...termine mounting location of selector switch and size flexible cable length accordingly Hook up the wires from the provided flexible cable to control board see wiring diagram while the cover is off At...

Page 8: ...low will automatically reset the silence feature The alarm signaling system is designed to work properly even if both the eyewash and drench shower are used simultaneously The alarm will continue to o...

Page 9: ...ensure the integrity of the unit G Check that the signaling station is functioning properly once the power is restored by activating the fixture attached to the signaling station S19 323 Signal Light...

Page 10: ...Component failure Check light connections and filament in the light Area light does not operate No power to the signal station Check that the circuit breaker or fuse is supplying power to the signal...

Page 11: ...ket Alarm Box GA 61 S90 634 1 General Area Hardware Kit Item Part No Qty Description 80 269 1421 1 Flowswitch 1 1 4 T DPDT 80 269 1522 1 Flowswitch 1 2 T DPDT 81 269 1902 1 Junction Box Conduit Outlet...

Page 12: ...32 269 1316 1 Conduit Nipple 3 4 x 6 33 169 1145 1 Elbow Pulling Conduit Item Part No Qty Description 34 269 2156 1 Close Nipple 3 4 Conduit 36 269 2460 Plug 3 4 Conduit NEMA 41 229 010 1 Selector Sw...

Reviews: