Lenox
®
Locker (includes Cubby & "Z" Lockers)
Installation
14 10/19/2017
Bradley •
LK-INSTR-001 Rev. N; ECN 17-13-005
Figure 9
FILLER
9/32" DIA . CLEARANCE
HOLE THROUGH LOCKER
BOTTOM INTO FLOOR
Drill 3/16" dia . pilot hole
through locker bottom in
concrete floor .
1/4" x 5" LG . TAPCON
SCREW (FAST-LF032)
Back-To-Back Locker Installation
9
Back-to-back locker installation is similar to standard installation. The base sections must be square
and plumb prior to installing lockers.
1 . Anchor the base sections to the floor using the hardware supplied (refer to Step 1 on page 4) .
2 . Fasten fillers to the corner lockers (refer to Step 2 on page 5) .
3 . Position, square and plumb the lockers onto the base, making sure locker tops and fronts are flush . Temporarily
clamp the adjoining locker sides together at the top and bottom . Drill four 9/32" holes through locker . The holes
should be located 1-1/2" from the front of the locker and evenly spaced from top to bottom (refer to Figures 3a
and 3b on page 6 if necessary) .
4 . Drill four 9/32" holes through one adjoining locker back (see Figure 9) . Fasten the lockers together using the
#10-24 male and #10-24 x 3/4" female sex bolts provided .
WARNING Island locker installation requires floor mounting in addition to locker-to-locker attachment.
WARNING For concrete floors, use a hammer drill with a six-inch long drill bit for pilot holes.
5 . Drill a 3/16" pilot hole through the bottom of each locker into the floor . Use a drill with a six-inch long drill bit .
The holes should be located near the front of the locker . Drill a 9/32" clearance hole through the bottom of each
locker into the floor . Secure the lockers to the floor with the Tapcon screws provided .