
Effectivity: 912 i Series
Edition 1/Rev. 0
d
053
55.
fm
MAINTENANCE MANUAL
BRP-Powertrain
76-70-00
Page 29
July 01/2012
THROTTLE POTENTIOMETER (TPS) - IN-
STALLATION
Fig. 38
INJECTION VALVE (INJ) - INSTALLATION
To do this, see section 73-10-00 Fuel pump and
distribution.
GOVERNOR - INSTALLATION
See also section 61-20-00 Governor.
DOUBLE IGNITION COIL - INSTALLATION
To do this, see section 73-10-00 Fuel pump and
distribution.
FUEL PUMP - INSTALLATION
To do this, see section 73-10-00 Fuel pump and
distribution.
CAUTION LAMP - INSTALLATION
See documentation of aircraft manufacturer.
FINISHING WORK
-
Complete the engine
-
Fill with operating fluids (coolant, oil or fuel).
See also section 12-20-00 Planned mainte-
nance.
-
Carry out an engine test run. See also section
12-20-00 Planned maintenance
Step
Procedure
1
Install the throttle body assy. To do this,
see section 73-10-00 Fuel pump and dis-
tribution.
2
Plug the respective wiring harness con-
nector into the throttle potentiometer.
1. Throttle valve potentiometer
2. Throttle body assy.
Summary of Contents for Rotax 912 i Series
Page 457: ......