Reports
7
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 28C • 01/2004
65
Subject to modifications resulting from technical improvements!
Boulter Buderus Ltd. • http://www.boulter-boilers.com
7
Reports
7.1
Start-up report
z
Please check off the start-up tasks carried out and enter
the corresponding readings.
Initial start-up tasks
Remarks or measurement readings
1.
Note down gas characteristics:
Wobbe-index
Operating heat value
_____________________ kWh/m
3
_____________________ kWh/m
3
2.
Inspect to check for leaks
(see subsection 2.1.4 on page 26)
3.
Check combustion air/flue gas connection
(see subsection 3.2.2 on page 32)
4.
Checking the boiler equipment (change to another type of gas if
necessary) (see subsection 2.1.5 on page 27)
5.
Carry out adjustment settings
(see subsection 2.1.6 on page 27)
6.
Measure the gas connection pressure (flow pressure)
(see subsection 2.1.7 on page 27)
_____________________ mbar
7.
Checking and adjusting the gas/air -ratio
CO
2
-content:
at full load
at part load
(see subsection 2.1.8 on page 29)
_____________________ Pa
_____________________ %
_____________________ %
8.
Leak test in operational condition
(see subsection 2.1.10 on page 30)
9.
Measure carbon monoxide content (CO), vacuum
_____________________ ppm
10. Function testing
Measuring the ionisation current
(see subsection 2.1.11 on page 30)
_____________________ µA
11. Fit the boiler casing
12. Instruct the user. Fill in Benchmark log book.
Hand over documentation (see subsection 2.1.12 on page 31)
13. Confirm initial start-up
Confirmation of initial start-up by qualified service technician
(Company stamp, signature)