Commissioning
6 720 808 928 (2017/06)
46
6.11.2 5kW & 3.5kW
Fig. 57 Central heating performance 5kW & 3.5kW
72
71
64
63
62
65
66
80/70°C
80/60°C
70/40°C
50/30°C
40/30°C
42
43
44
45
46
47
48
49
50
37
38
35
36
34
33
32
31
32
33
39
38
37
36
35
34
33
32
31
42
43
44
45
46
47
48
49
51
50
65
66
67
64
63
72
71
73
80/70°C
80/60°C
70/40°C
50/30°C
40/30°C
33
34
32
31
50
55
60
65
70
75
80
85
90
[l/s]
[l/h]
1
[°C]
2
∆P
[kPa]
3
4
5
6
7
8
9
10
6
5
4
3
2
1.5
1 0.9
0.7
0.8
0.6
0.4
0.5
0.3
0.15
0.2
0.1 0.09 0.08 0.07
8
9
10
15
7
6
5
4
3
2
1.5
0.8
0.9
1
0.7 0.6
0.5
0.3
0.4
0.15
0.2
10
15
20
9 8 7 6
5
4
3
2
1.5
1 0.9 0.8 0.7 0.6
0.5
0.4
0.3
0.2
0.15
20
10
15
9 8 7
6
5
4
3
2
1.5
1 0.9 0.8 0.7 0.6
0.5
0.4
0.3
0.2
Kv = 1.7 m³/hr
Kv = 1.4 m³/hr
Kv = 1.3 m³/hr
Kv = 1.1 m³/hr
45
50
60
70
80
90
11
0
120
100
150
130
140
200
250
350
450
500
600
0.014
0.016
0.02
0.018
0.022
0.024
0.026
0.028
0.03
0.035
0.04
0.05
0.06
0.07
0.08
0.09
0.1
0.12
0.14
0.16
6720808928-59.1Wo
[°C]
5 kW
3.5 kW
a
b
c
d
Summary of Contents for Worcester Greenstar HIU
Page 65: ...6 720 808 928 2017 06 65 Notes ...
Page 66: ...6 720 808 928 2017 06 66 Notes ...