background image

EN

Installation manual

SE 60 LSNi

SE 60 LSNi SmartKey Blocking Unit

Security Systems

Summary of Contents for SE 60 LSNi

Page 1: ...EN Installation manual SE 60 LSNi SE 60 LSNi SmartKey Blocking Unit Security Systems ...

Page 2: ...ctions Mounting the system components 6 Mounting of magnet contact and bolt contact 6 Connecting the control panel and optional components 7 Programming 8 SPE blocking element function test 8 Completing the system installation 8 Fault elimination 11 Notes on maintenance and service General 10 Inspection and maintenance 10 Replacing the bolt in the SPE blocking element 11 Technical data 112 ...

Page 3: ...e use of conventional contacts is recommended as these can be directly processed by the control unit SE 60 LSNi control unit The control unit processes the status reports from all components in the system communicates these reports to the intrusion detection system and controls the SPE blocking element The control unit is mounted in the secure area Bolt contact A conventional bolt contact can be c...

Page 4: ...e scope of the basic functions the inputs and outputs must be laid out according to a specific scheme X REEG 12K1 already installed Y Points 21 22 and 23 24 are connected internally N A N A V 0 V aLSN1 bLSN1 V 0 V aLSN2 bLSN2 Ground DK A B C D N A N A X REEG PL2 N A N A EW1a EW1b PL1 0 V 0 V 0 V LSZ Ground 12 V SPE 0 V HALL1 HALL2 MOT2 MOT1 Test LED BR1 Y B1 operation B3 bolt test N A N A N A N A ...

Page 5: ...f 0 V is applied the SPE blocking element bolt retracts 18 N A 21 22 23 24 N A N A Distributor Distributor Free plug in terminals 21 and 22 connected Free plug in terminals 23 and 24 connected 37 38 39 40 41 42 MOT2 MOT1 HALL2 HALL1 0 V V Output Input Input Output Output SPE blocking element motor control Bolt starting position detection Bolt final position detection SPE blocking element 0 V power...

Page 6: ...tion be aware that the SPE blocking element has a fixed molded cable of 6 m length which cannot be extended Mounting the SPE blocking element Mount the SPE blocking element using the appropriate kit in line with the mounting instructions enclosed Ensure the door cannot bang shut Otherwise the SPE blocking element bolt could be damaged during commissioning by a door banging shut 2 Mounting of magne...

Page 7: ...control unit 0 0 0 LSNi mode with automatic addressing of the control unit The address of the control unit is set by adjusting the three rotating switches Use a flat blade screwdriver to set each switch The switches click as they turn The valid range is 1 to 254 Settings between 255 and 299 lead to an error message on the control panel X REEG 12K1 already installed Y Points 21 22 and 23 24 are con...

Page 8: ...e LED on the control unit goes out 3 Repeat steps 1 2 with the door closed to check the bolt on the SPE blocking element fits into the bolt receiver accurately 4 After the function test insert the jumper back into bridge B1 in the control unit The yellow LED on the control unit circuit board shows the status of the system as follows LED Status Required action off System is OK None Single flashing ...

Page 9: ...amaged Check the SPE blocking element is assembled and mounted correctly then repeat the test If this is not successful replace the SPE blocking element Operating problems under normal circumstances Problem Possible cause Elimination Door cannot be unlocked although the bolt contact is open Bolt jams door might be slightly warped Shake the door lightly and operate the bolt contact again If this is...

Page 10: ...est of the tamper contact in the control unit Visual inspection of the mounting damage SPE blocking element function test Function test of the SPE blocking element with bolt contact 1 Operate the bolt contact while the door is closed The SPE blocking element bolt extends 2 Return the bolt contact to its normal position The SPE blocking element bolt retracts Function test of the SPE blocking elemen...

Page 11: ...ing the plastic cover for the bolt piece for on door mounting or the collar built in version On the on door version it may be necessary to unscrew the magnet contact housing 2 Release the screws on the SPE blocking element 1 and remove the cover 3 Slightly lift the worm gear 2 on the motor so that the bolt 3 is released from the gear framework 4 Pull out the bolt 5 Insert a new bolt 6 Return the m...

Page 12: ...ines The system fulfills all the requirements resulting from the relevant laws standards and guidelines in particular EN 61000 6 3 EN 50130 4 DIN VDE 0833 Part 1 and 3 VdS 2110 VdS 2227 VdS 2119 VdS 2311 VdS 2203 VdS 2252 Blocking element Maximum distance between bolt and locking plate 4 mm Bolt break force Approx 1 kN Cable to control unit Max 6 m 6 pin shielded permanently sealed Environmental C...

Page 13: ...Notes 13 ...

Page 14: ...Notes 14 ...

Page 15: ...Notes 15 ...

Page 16: ...Bosch Security Systems For more information please visit www boschsecurity com Bosch Sicherheitssysteme GmbH Robert Bosch Ring 5 85630 Grasbrunn Germany F 01U 341 973 A4 04 2017 ...

Reviews: