
9
Commissioning
9.1
Safety
High electrical voltage! Danger to life, risk of
injury due to electric shock.
WARNING
Live parts are dangerous.
●
Do not open any covers or flange sockets during opera‐
tion.
●
Never connect or disconnect plug connectors under
load!
Risk of injury due to rotating motor shaft!
WARNING
●
Do not remove any covers, machine parts or protection
devices during operation.
●
Do not enter the range of movement of the machine.
Prevent persons from entering this area, e.g., by means
of
–
safety fence, safety guards, protective covers
–
Optical sensors
Thermal danger due to hot surfaces with tem‐
peratures over 70 °C during operation
CAUTION
●
Do not touch hot motor surfaces.
●
Install protection against contact, if necessary.
●
Make sure that no temperature-sensitive components
(cables, electronic components, ...) touch hot surfaces.
9.2
General
Motor-pump units can only be commissioned with other components (drive
controller, control unit). For commissioning of the motor-pump unit, two steps
are necessary:
1. Commissioning of the pump drive (motor control)
2. Commissioning the pump
Prior to commissioning
Prior to commissioning, ensure that the following requirements are met.
●
Storage time of the components. Depending on the storage time, take
measures to ensure safe operation. Run in bearings, resurface the hold‐
ing brake, ... .
See also
chapter 6.5 "Product Storage" on page 44
.
●
Ensure that all flange socket are correctly connected and protected
against coming loose.
●
Ensure that the motor-pump unit and all participating components of the
drive are undamaged.
DOK-SYTROX-MPES2******-IT01-EN-P
Rexroth Sytronix FcP 50xx/70xx Motor-Pump Unit MPES2
Bosch Rexroth AG
73/143
Commissioning
LSA Control S.L. www.lsa-control.com [email protected] (+34) 960 62 43 01