Thread
Tightening torque
M4
1.4 Nm
M5
2.8 Nm
Tab. 14-1: Tightening torques
Ensure that the IP degree of protection of the device is kept during
maintenance.
Include the following tasks into the maintenance schedule:
●
Check all plug and terminal connections of the components for proper tight-
ness and possible damage at least once a year. Check that cables are not bro-
ken or crushed. Replace damaged parts immediately
●
Check the fan regarding soiling and increased running noise at least once a
year
Function compatibility for spare parts is ensured for at least five
years.
14.2 Hard disk(s)
The hard disk(s) is/are mounted on a carrier plate that can be pulled out from
the housing. The hard disk(s) can be replaced, including the installation frame.
Damages to the device due to electrostatic dis-
charges!
NOTICE
Comply with all ESD protective measures while working with modules and com-
ponents! Avoid electrostatic discharges!
To avoid data loss and new installations of the operating system and
application programs, backup hard disk data regularly.
The new hard disk(s), including the installation frame, is/are provi-
ded upon delivery. The new hard disk(s) is/are always installed with
the installation frame.
To exchange the hard disk(s), proceed as follows:
1. Store all required user data as well as the operating system settings of your
system either on an external storage medium or via the network connec-
tion!
2. Switch off the supply voltage.
Control Cabinet PC
Bosch Rexroth AG
Maintenance
DOK-SUPPL*-VPB*40.3***-IT05-EN-P
45/57
Summary of Contents for Rexroth IndraControl VPB 40.3
Page 1: ...IndraControl VPB 40 3 Control Cabinet PC Operating Instructions R911336750 Edition 05 ...
Page 6: ...Bosch Rexroth AG Control Cabinet PC IV DOK SUPPL VPB 40 3 IT05 EN P ...
Page 61: ...Control Cabinet PC Bosch Rexroth AG DOK SUPPL VPB 40 3 IT05 EN P 55 57 ...
Page 62: ...Bosch Rexroth AG Control Cabinet PC 56 57 DOK SUPPL VPB 40 3 IT05 EN P ...