Commissioning 27/84
3 842 540 399/2016-11, MIT: ID 200,
Bosch Rexroth AG
6.2 Connection
WARNING
Incorrect electrical connection!
Incorrect connections can result in damage to the system.
f
Before commissioning, familiarize yourself with the communication between
your PROFIBUS DP master and the write/read station. Check all connections
prior to commissioning.
Once the supply voltage is connected and the device is initialized, the “PWR/ERR2”
LED lights up green. If the LED lights up red, the initialization is not yet complete or
a device error has occurred.
6.3 Device settings
CAUTION
Device not configured or configured incorrectly!
An incorrectly configured device can cause faults in the system.
f
Configure the device prior to commissioning.
Various parameters must be set prior to commissioning.
There are volatile and non-volatile parameters. Volatile parameters return to their
condition as supplied automatically each time the device is switched off and on again.
Non-volatile parameters:
Parameter
Condition as supplied
Value range
General
Multiplex mode
off
on / off
Antenna
Trigger mode
off
on / off
Data carrier type
99
00…FF
PROFIBUS interface
Slave address
126
00…7E
f
Configure the write/read station with the system commands described (see
section 7.3.5 “Command overview” ). “99” is pre-set as the data carrier type.
EN
GLISH