4.4
Acceptance test
Before initial start-up of the system or after changing a motor, do an accept‐
ance test. The acceptance report must confirm compliance with the instruc‐
tions and conditions of use given here. After repair and if safety-relevant
components have been serviced, the unit test of the motor must be carried
out again in accordance with EN 60079‑15 if the explosion protection proper‐
ties have been changed.