Moving and Storage
|
5
LM Series Heat Pump
8 733 905 315 (2013/9)
Revised 09-13
Figure # 2 Left-Hand Unit (Right-Hand Unit is opposite view)
[1] Air handler access panel
[2] Condensing section access panel
[3] Condensate drain connection
[4] Water connection
[5] Electrical connection knockout
[6] Electric Heat electrical connection knockout
(Optional)
[7] Blower outlet (Supply Air)
[8] LED Error Code
MOVING AND STORAGE
If the equipment is not needed for immediate
installation upon its arrival at the job site, it should
be left in its shipping carton and stored in a clean,
dry area. Units must only be stored or moved in the
normal upright position as indicated by the “UP”
arrows on each carton at all times.
INITIAL INSPECTION
Be certain to inspect all cartons or crates on each
unit as received at the job site before signing the
freight bill. Verify that all items have been received
and that there are no visible damages; note any
shortages or damages on all copies of the freight
bill. In the event of damage or shortage, remember
that the purchaser is responsible for filing the
necessary claims with the carrier. Concealed
damages not discovered until after removing the
units from the packaging must be reported to the
carrier within 24 hours of receipt.
LOCATION
Locate the unit in an indoor area that allows easy
removal of the filter and access panels, with
enough room for service personnel to perform
maintenance or repair. Provide sufficient room to
make fluid, electrical, and duct connection(s). If
the unit is located in a confined space such as a
closet, provisions must be made for return air to
freely enter the face of unit’s air coil. On horizontal
units, allow adequate room below the unit for a
condensate drain trap and do not locate the unit
above supply piping.
BLOWER CONFIGURABILITY
To change configuration of the LM unit requires
the purchase of a separate Blower panel
Conversion Kit. Please refer to the
Spare Parts
List_
8733911143
(On website
www.fhp-mfg.com
)
and the
Blower Configurability IM_8733911121.
1
2
3
6
7
2
8
5
4
For storage If unit stacking is required,
stack units as follows:
Do not stack 6 ton units!
Vertical units: less than 6 tons, no more
than two high.
Horizontals units: less than 6 tons, no more
than three high.
These units are not approved for outdoor
installation; therefore, they must be
installed inside the structure being
conditioned. Do not locate in areas that are
subject to freezing.
Summary of Contents for LM Series
Page 39: ...Wiring Diagrams 39 LM Series Heat Pump 8 733 905 315 2013 9 Revised 09 13 Figure 26 ...
Page 41: ...Wiring Diagrams 41 LM Series Heat Pump 8 733 905 315 2013 9 Revised 09 13 Figure 28 ...
Page 43: ...Wiring Diagrams 43 LM Series Heat Pump 8 733 905 315 2013 9 Revised 09 13 Figure 30 ...
Page 45: ...Wiring Diagrams 45 LM Series Heat Pump 8 733 905 315 2013 9 Revised 09 13 ...
Page 47: ...Wiring Diagrams 47 LM Series Heat Pump 8 733 905 315 2013 9 Revised 09 13 Figure 31 ...
Page 49: ...Wiring Diagrams 49 LM Series Heat Pump 8 733 905 315 2013 9 Revised 09 13 Figure 33 ...
Page 59: ...Notes 59 LM Series Heat Pump 8 733 905 315 2013 9 Revised 09 13 NOTES ...