
1 690 706 220
2016-09-14
|
Robert Bosch GmbH
Mechanical and electrical installation | FWA 4650 | 49
en
5. Mechanical and
electrical installation
16900012_Re
Fig. 3:
WLAN-Box
!
The mains connector must be unplugged before
opening the WLAN-Box.
i
The following fitting locations are suggested for the
WLAN-Box.
!
When drilling take care not to damage or impair the
operation of any electrical, hydraulic, pneumatic or
mechanical lifting platform components.
!
When deciding on the fitting location, make
sure there is always sufficient space around the
WLAN-Box whatever the lifting platform position
(including adjustable runways and together with
the vehicle) to avoid any risk of crushing and
damage and to ensure that the escape route is not
obstructed.
!
Before drilling any holes in the lifting platform,
make sure this is authorised by the lifting platform
manufacturer. If not, use must be made of an
alternative attachment method such as clamping,
bonding or welding on pins.
i
The list of approved lifting platforms is constantly
being updated and the latest status can be called up
in the internet through the Bosch home page.
5.1
Installation at control column of
4-column lifting platform
(suggestion 1)
5.1.1
Fitting
i
WLAN-Box fitting procedure for 4-column lifting
platform. Fitting location:
16900026_Re
16900025_R
e
1
2
Fig. 4:
Suggestion 1 for fitting WLAN-Box on 4-column lifting
platform
1 Control column (= front left)
2 WLAN-Box
1. Choose a fitting location on the control column.
2.
Mark holes (1 x each) on both fastening strips in
accordance with the drilling pattern.
Summary of Contents for FWA 4650
Page 2: ......