![Bosch FPC-500 Operation Manual Download Page 32](http://html.mh-extra.com/html/bosch/fpc-500/fpc-500_operation-manual_39343032.webp)
32
en | Appendix
Conventional fire panel
2019.07 | 5.1 | F.01U.172.982
Bosch Sicherheitssysteme GmbH
Record all events, such as alarms, faults and services, in this log
book.
Ensure that an inspection is carried out on your fire detection
system four times a year at roughly regular intervals.
Ensure that the following function checks are carried out during
the inspection:
–
Trigger an automatic detector for each zone to check the
transmission lines and notification appliances
–
Test the condition of the batteries and the function of the
power supply unit
–
Check the log book
Record the inspection and the results in the log book.
Carry out the following additional checks at least once a year:
–
Check all elements of the fire panel
–
Trigger all detectors that can be tested without being
damaged
–
Visually check all cabling and elements
Notice!
Have maintenance and inspection work carried out regularly by
trained, qualified personnel
Please observe the appropriate requirements stipulated by the
local authorities (e.g. fire service)
Notice!
Replace the batteries regularly. Please observe the appropriate
requirements stipulated by the local authorities etc.
7
Appendix
7.1
Event Memory
Message
Meaning
Drill/Evacuate
A manual alarm has been triggered on the
panel.
Summary of Contents for FPC-500
Page 1: ...Conventional fire panel FPC 500 en Operation manual ...
Page 2: ......
Page 36: ...36 Appendix Conventional fire panel 2019 07 5 1 F 01U 172 982 Bosch Sicherheitssysteme GmbH ...
Page 37: ...Conventional fire panel Appendix 37 Bosch Sicherheitssysteme GmbH 2019 07 5 1 F 01U 172 982 ...
Page 38: ...38 Appendix Conventional fire panel 2019 07 5 1 F 01U 172 982 Bosch Sicherheitssysteme GmbH ...
Page 39: ......