RAID Subsystem DVA-08K | Installation Manual
Subsystem Connection and Operation | en
35
Bosch Security Systems
F.01U.027.797 | V1 | 2006.05
5.4.5
LCD Screen
When powering on the subsystem, the following messages should appear on the front panel
LCD screen. Wait for the front panel LCD to show “READY” or “No Host LUN” before turning
on the host computer. Refer to
on how to read the screens.
Fig. 5.3
The LCD Initial Screen
The LCD screen startup sequence is shown and described in the sequence below:
i
NOTICE!
The subsystem has been designed to run continuously. If a hot-replaceable component fails,
the fault can be corrected online.
This screen appears when the PSUs are turned
on.
Proceeding with controller self-test.
Self-test completed.
Summary of Contents for DVA-08K
Page 1: ...RAID Subsystem DVA 08K DVA 08K SCSI Premium Series en Installation Manual ...
Page 2: ......
Page 61: ......