Fig. 38:
2
)
X
M
4x
D
= 7 Nm
SW4
SW10
M
D
= 8 Nm
BS 2/R-H
BS 2/R-V
2
)
3 842 538 872
7
6
5
7
9
4
8
"X"
9
M
4x
D
= 7 Nm
SW4
10
SW27
3
7
5
6
3 842 539 357
8 981 010 511
563 833-46
3 842 530 417
4
)
4
)
3
)
3
)
Shortening the conveyor chain BS 2/C-H, BS 2/R-H, BS 2/R-V+ 1200, MA = R/L (2/2)
4.
Fix the chain tensioner
.
5.
Open the chain at the
chain lock.
6.
With the disassembly
tool
3
), remove so many
chain links that you can
close the chain as closely
at the chain tensioner
as possible.
3
) Disassembly tool:
– for fl at top chain:
3 842 010 510
– for accumulation roller chain:
3 842 010 511
– for accumulation roller chain
Vplus:
3 842 539 537
4
) Chain lock:
– for fl at top chain:
3 842 535 333
– for accumulation roller chain:
3 842 530 417
– for accumulation roller chain
Vplus:
3 842 538 872
Please note:
• Remove the same number of
chain links for both chains.
• Note in the maintenance
plan how many chain links
you have removed.
• Replace the chain
if the permissible
elongation of the chain
(= 3% of the original length)
is exceeded.
7.
Close the chain.
8.
Loosen the chain
tensioner.
Check the tension of
the chain.
9.
Install the lower cover
sheets and the side
cover plates.
10.
Install the gear motor.
56/84
Maintenance and repair
Bosch Rexroth AG
, MIT: BS 2/C-…, BS 2/R-…, 3 842 563 834/2022-08