www.renewableenergyhub.co.uk

Summary of Contents for SOLAR PLUS

Page 1: ...Installation manual www renewableenergyhub co uk ...

Page 2: ......

Page 3: ...Solar Plus installation manual V2 0 April 2017 3 Information About the Solar Plus Technical information Installation location Installation User instructions Guarantee 4 5 6 7 8 9 10 Contents ...

Page 4: ...re when moving equipment to ensure there is no damage to the equipment or existing structure and fittings Install the equipment in a dry ventilation location Do not install the equipment in the following places as they will lead to a malfunction of the equipment areas with corrosive gases factories where the electrical voltage experiences wide fluctuations places with strong electromagnetic waves ...

Page 5: ...tage and maintains connection grid connection until the voltage reaches or exceeds 253V At this point to prevent the PV inverter from an over voltage shut down the Solar Plus activates and steps down incoming voltage 000123 Suppliers isolator Suppliers meter Suppliers fuses Consumer unit AC isolator PV Inverter DC isolator PV array Distance less than 1 metre Grid PV power flow PV power flow About ...

Page 6: ...ax load Dimensions Weight Terminal capacity Enclosure Ingress protection Cable entry Solar Plus 207V 253V 50Hz 4kW 325mm x 150mm x 80mm 3 0 kg Incoming live 10 0mm2 Outgoing live 6 0mm2 Incoming neutral 10 0mm2 Outgoing neutral 6 0mm2 Non combustible mild steel powder coated IP20 2 x 20mm grommets ...

Page 7: ...nit should be appropriately sized protected secured and kept to a minimum distance not exceeding 1 meter NOTE The Solar Plus lid can only be removed when the switch is in the off position The installation location should be clean dry and well ventilated Please refer to the diagrams below for product dimensions Please refer to the diagrams below for product dimensions 325 mm 156 mm 107 mm 150 mm 80...

Page 8: ...in the diagram below Connect the mains side cable from the consumer unit to the Solar Plus Input terminals Connect the secondary cable from the PV Inverter Solar Plus output terminals On completion of installation the tightness of all electrical connections should be checked before energising the Solar Plus 000123 1 PV inverter 2 AC isolator 3 Solar Plus 4 Suppliers meter 5 Suppliers isolator 6 Co...

Page 9: ... this if the incoming voltage remains below 253V for the entire 5 minutes the Solar Plus will then enter standby mode the red status light will then illuminate Check to ensure the Solar Plus does enter standby mode In the event the Solar Plus detects a supply voltage greater than 253V the internal relay will de energise and disconnect the PV inverter from the supply The relay will remain de energi...

Page 10: ... product guarantee within 30 days of installation The Solar Plus must be installed as per the instructions set out in this installation manual to ensure a full guarantee for a period of 5 years from the date of manufacture This guarantee is a parts only guarantee limited to the replacement of faulty components only ...

Page 11: ...Solar Plus installation manual V2 0 April 2017 11 Notes ...

Page 12: ......