
AHD-WNL Monitoring & Control with iPad
®
Integration
Technical Information
26
V1
(Illustration similar)
4.4.3 Power Supply
AHD-WNL can be powered on by connecting the power supply in
the distribution box or with a separate switch, installed by the ship-
yard.
TIP!
To ensure that AHD-WNL starts automatically, it
should be powered on by connecting its power
supply in the distribution box.
To power on the unit by connecting the power supply in the distri-
bution box, terminals IGN and + must be bridged.
IGN and + bridged