8.9.4
Checking the hydraulic lines
This work must only be performed by an
expert / qualified person!
1.
Park the machine in secured condition
Chapter 6.7 „Parking the machine in
secured condition“ on page 113
.
2.
Check all hydraulic lines.
Hydraulic hoses must be immediately
replaced if:
n
the outer layer is damaged down to the
inlay (e.g. chafing, cuts, cracks),
n
embrittlement of the outer layer or for-
mation of cracks in the hose material,
n
the hose shows deformation in pressur-
ized and depressurized condition, which
do not comply with the genuine shape of
the hydraulic hose (e.g. layer separa-
tion, formation of blisters, crushed spots,
buckling),
n
leaks on hose, socket or fitting,
n
the hydraulic hose has separated from
the fitting,
n
fittings are damaged or deformed,
whereby the function and strength of the
hose - fitting connection is impaired,
n
the fitting shows corrosion that impairs
both function and strength,
n
incorrect installation (squeezing,
shearing or chafing points),
n
paint covered hydraulic hoses (no detec-
tion of identifications or cracks),
n
shelf life and service life exceeded.
3.
Replace damaged hydraulic hoses immedi-
ately, fasten these properly and avoid
chafing.
4.
Only operate the machine after it has been
repaired.
Maintenance – Every 500 operating hours
BW 100 AD-5
162
Summary of Contents for BW 100 AD-5
Page 2: ...2 ...
Page 9: ...1 Introduction Introduction BW 100 AD 5 9 ...
Page 13: ...2 Technical data Technical data BW 100 AD 5 13 ...
Page 19: ...3 Concerning your safety Concerning your safety BW 100 AD 5 19 ...
Page 64: ...Concerning your safety Signage BW 100 AD 5 64 ...
Page 65: ...4 Indicators and control elements Indicators and control elements BW 100 AD 5 65 ...
Page 81: ...5 Checks prior to start up Checks prior to start up BW 100 AD 5 81 ...
Page 96: ...Checks prior to start up Checking the hydraulic oil filter BW 100 AD 5 96 ...
Page 97: ...6 Operation Operation BW 100 AD 5 97 ...
Page 122: ...1 Plug Y04 Operation Emergency procedures BW 100 AD 5 122 ...
Page 123: ...7 Loading transporting the machine Loading transporting the machine BW 100 AD 5 123 ...
Page 134: ...Loading transporting the machine After transport BW 100 AD 5 134 ...
Page 135: ...8 Maintenance Maintenance BW 100 AD 5 135 ...
Page 188: ...Maintenance As required BW 100 AD 5 188 ...
Page 189: ...9 Setting up refitting Setting up refitting BW 100 AD 5 189 ...
Page 197: ...10 Troubleshooting Troubleshooting BW 100 AD 5 197 ...
Page 208: ...Troubleshooting Trouble shooting ECONOMIZER BW 100 AD 5 208 ...
Page 209: ...11 Disposal Disposal BW 100 AD 5 209 ...
Page 211: ......