background image

 

 

BOH-PM-16-1 
Chapter 1 Rev. 2.04  

 

 

 

 

                                    

© 2017 BOH Environmental, LLC 

 

 

FPU

®

 SYSTEMS OPERATION MANUAL 

(INCLUDING REPAIR PARTS)

 

EXPEDITIONARY CONTAINERIZED AUTHORIZED STOCKAGE LIST (ECASL) 

BOH FPU Field Pack-up Units 

 

US Patent Number US 6299008 

European Patent Number EP 1224127 

 

 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

ECASL #4 (of 5) configuration shown (example) 

(Doors removed for clarity) 

 
 
 
 
 
 
 
 
 

BOH FPU

®

 SYSTEMS 

BOH ENVIRONMENTAL LLC 

14520 Avion Parkway, Suite 220 

Chantilly, Va. 20151 

POC Doug Cresap (985) 674-0725 

http://www.bohfpusystems.com 

Summary of Contents for FPU

Page 1: ...ZED AUTHORIZED STOCKAGE LIST ECASL BOH FPU Field Pack up Units US Patent Number US 6299008 European Patent Number EP 1224127 ECASL 4 of 5 configuration shown example Doors removed for clarity BOH FPU...

Page 2: ...BOH PM 16 1 Chapter 1 Rev 2 04 2017 BOH Environmental LLC This page was intentionally left blank...

Page 3: ...round guide is pinned between the FPU 20 3 container and other objects Forklift operators must maintain visual contact with their ground guides at all times Always follow standard forklift procedures...

Page 4: ...m and into FPU containers Forklift operator should maintain visual contact with ground guides at all times Ground guides should never come between the module and container during loading process If vi...

Page 5: ...ARNING Protective gloves should be worn when handling metal parts in high temperatures Failure to wear gloves may result in burning or blistering of the skin upon contact WARNING Protective gloves sho...

Page 6: ...crush and harm SLICK FLOOR wavy line on floor with legs prone shows that slick floor presents a danger for slipping or falling HEAVY OBJECT human figure stooping over heavy object shows physical inju...

Page 7: ...ponents and Accessories 0003 00 Equipment Data Labels Identifications Markings and Airlift Certification 0004 00 CHAPTER 2 OPERATOR INSTRUCTIONS Preparation for Movement 0005 00 Operation of FPU Conta...

Page 8: ...to Maintenance Allocation Chart MAC 0041 00 Maintenance Allocation Chart MAC 0042 00 Introduction to Repair Parts List 0043 00 Repair Parts List ECASL Configurations 1 5 0044 00 Repair Parts List FPU...

Page 9: ...into six major chapters that detail the topics mentioned above Within each chapter are work packages covering a wide range of topics Each work package is numbered sequentially at page 1 and has its ow...

Page 10: ...BOH PM 16 1 Chapter 1 Rev 2 04 2017 BOH Environmental LLC This page was intentionally left blank...

Page 11: ...04 2017 BOH Environmental LLC FPU SYSTEMS OPERATION MANUAL INCLUDING REPAIR PARTS EXPEDITIONARY CONTAINERIZED AUTHORIZED STOCKAGE LIST ECASL BOH FPU Field Pack up Units CHAPTER 1 INTRODUCTORY INFORMAT...

Page 12: ...BOH PM 16 1 Chapter 1 Rev 2 04 2017 BOH Environmental LLC This page was intentionally left blank...

Page 13: ...nary Containerized Authorized Stockage List ECASL Systems and their associated equipment Type of Manual This is an Operator Unit and Direct Support Operation and Maintenance Manual including Repair Pa...

Page 14: ...y 2 Purpose of Equipment The ECASL configurations each consist of an FPU 20 3 container with various inserts selected to accommodate particular applications ECASL 1 palletized bulk floor loaded bulk a...

Page 15: ...rioration of other material such as rubber and plastic Unusual cracking softening swelling or breaking of these materials may be a corrosion problem All units must adhere to their specific corrosion m...

Page 16: ...BOH PM 16 1 Chapter 1 Rev 2 04 2017 BOH Environmental LLC This page was intentionally left blank...

Page 17: ...t have been specifically designed for direct load on to the Heavy Expanded Mobility Tactical Truck with a load handling system HEMTT LHS Palletized Loading System PLS and PLS trailer without the use o...

Page 18: ...v 2 04 2017 BOH Environmental LLC 0002 00 2 ECASL Configuration 2 ECASL Configuration 3 CURB SIDE REAR ROAD SIDE ROAD SIDE REAR FRONT OR BAIL BAR END CURB SIDE CURB SIDE REAR ROAD SIDE ROAD SIDE REAR...

Page 19: ...7 BOH Environmental LLC 0002 00 3 ECASL Configuration 4 ECASL Configuration 5 END OF WORK PACKAGE CURB SIDE REAR ROAD SIDE ROAD SIDE REAR FRONT OR BAIL BAR END CURB SIDE CURB SIDE REAR ROAD SIDE ROAD...

Page 20: ...BOH PM 16 1 Chapter 1 Rev 2 04 2017 BOH Environmental LLC This page was intentionally left blank...

Page 21: ...r restraint straps forklift pockets and a convection type ventilation system Bulk Storage Module The BOH FPU Bulk Module is designed for the storage of large heavy material and the Bulk Module 3 is de...

Page 22: ...Storage Aids for the FPU 20 3 consists of four vertical uprights that are mounted to the floor and ceiling of the containers eight 48 inch wide by 12 inch deep drawers two 48 inch wide by 2 inch deep...

Page 23: ...in use For storage removal and installing the rear rollers refer to chapter 2 WP 0005 00 EQUIPMENT DATA FPU 20 3 Length 20 foot 6 1m Width 8 foot 2 44m Height 8 foot 2 44m Tare Weight 8 660 lbs ECASL...

Page 24: ...BOH PM 16 1 Chapter 1 Rev 2 04 2017 BOH Environmental LLC This page was intentionally left blank...

Page 25: ...ontainers CSC See Internal Air Transport Certification issued by ATTLA dated 29 June 2016 file number 2008 09 15 Rev 6 BOH FPU CONTAINER and CSC Data Plates The BOH ISO data plates are affixed to the...

Page 26: ...tes FPU data plates identify the manufacturer s part number serialization contract and delivery order number and National Stock Number NSN They are located visibly at the exterior rear end of each con...

Page 27: ...BOH Environmental LLC 0004 00 3 SIGNAGE ON THE ROOF BOH FPU containers have a series of markings that provide information and identification for shipping containers when transported aboard ships TOP V...

Page 28: ...BOH PM 16 1 Chapter 1 Rev 2 04 2017 BOH Environmental LLC This page was intentionally left blank...

Reviews: