background image

 

 

1

 

Basic Function Introduction 

Ⅰ.

Support 1 operating language. (English language)

 

. We need to put the sample by hand after taking pendulum in the test, and complete return pin, impact. Put the sample by 

hand again after equipment automatic taking pendulum. Every time when the experiment is complete system display area will 
show test results. Three test results as a group, the system automatically calculate three times the average of the impact energy 
after completing a set.

 

Ⅲ.

 Storage function: can store 10 groups test data (optional).

 

Ⅳ. 

Printing function: print test data by micro printer (optional).

 

Ⅴ.

Choose from two energy levels 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

CONTROL PANEL 

DIGITAL PANEL 

CHARPY PENDULUM 

SAFETY CAGE 

INDICATOR 

Summary of Contents for JB-300S

Page 1: ...ne BMS Bulut Makina Sanayi ve Ticaret Ltd Şti İkitelli Organize Sanayi Bölgesi Dolapdere Sanayi Sitesi Ada 4 No 7 9 Başakşehir İSTANBUL Tel 0212 671 02 24 25 Fax 0212 671 02 26 Web site www bulutmak com e mail bms bulutmak com OPERATIONAL MANUAL ...

Page 2: ... Interface 4 2 1 Operation Interface 4 2 2 Input Interface 4 2 3 Printing Test Results Interface 4 2 4 Password Interface 5 2 5 System Parameter Debugging Interface 5 2 6 Store Call Interface 5 3 Operating Introduction 6 3 1 Testing Operation 6 ...

Page 3: ...pendulum Every time when the experiment is complete system display area will show test results Three test results as a group the system automatically calculate three times the average of the impact energy after completing a set Ⅲ Storage function can store 10 groups test data optional Ⅳ Printing function print test data by micro printer optional Ⅴ Choose from two energy levels CONTROL PANEL DIGITA...

Page 4: ...rface is the interface of inputting basic information in preparation for the calculation of impact toughness 2 3 Printing Test Results Interface After the test pressing print button in the sample information interface and turn up print report preview In print preview press the print button to print out the test results Before printing required external micro printer printer please make your own co...

Page 5: ...lease don t enter the system parameter interface all the parameters have been debug well before equipment is out of factory Please do not change it at will otherwise it will lead to the test result is not accurate 2 6 Store Call Interface This interface is history query interface can inquire the recent one hundred groups of test results ...

Page 6: ...ndulum will fall slowly loosen button when lead to vertical position the pendulum stops 5 Energy Changing over Press this button repeatedly two energy level change to each other by energy change system Note The pendulum size of the actual use and must be consistent with selected pendulum size power on digital display table 6 System Parameters Press this button can enter the password interface if i...

Reviews: