
66
INSTALLATION AND OPERATING INSTRUCTIONS · HSI
EN
LCD Setting
After pressing and holding "ENTER" button for 3 seconds, the unit will enter setting mode .
Press "UP" or "DOWN" button to select setting programs . And then, press "ENTER" to con-
firm or "MENU" for 8 seconds to exit .
Setting Programs:
Programm
Selectable option
Description
Select the setting of inverter .
Select the setting of solar charger .
Select the setting of the system .
INVERTER
Power use
mode
Utility first (default)
UTI: Utility will provide power to the loads as
first priority . Solar and battery energy will provide
power to the loads only when utility power is not
available .
SOL: The inverter will turn to offered state when
the solar energy is enough .
SBU: Solar energy provides power to the loads as
first priority .
If solar energy is not sufficient to power all con-
nected loads, battery energy will supply power to
the loads at the same time .
Solar first
SBU priority
Maximum
charging
current
(DC)
60 A (default)
80 A (max)
To configure total charging current for solar ant
utility chargers . (Max . charging current = utility
charging c solar charging current)
Maximum
Grid charg-
ing current
(DC)
20A (default)
30A (max)
Sets the maximum grid charging current .