1), before use the vacuum pump, please adds water to the tank.
Here are steps, please open the high water level valve, then add water until the water outflow from it.
Close high water level valve. Please power on of the motor about 15 minutes later, wait for the pump
is full of water. The pump must be full of water.
2), every day, please check the water of the tank before work.
3), regular cleaning of the water tank. Every 2 months to clean up the water tank. Open low level water
valve let water outflow. Rinse several times.
4),regular cleaning the filter .every week.
Pump for spindle water cooling
If your spindle is water cooling,you should do like this.
1,Find the box of the pump .
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT
BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT BLUE ELEPHANT