background image

 

28mm Middle Eastern Building #4 
B28-ME-004 

 
Please read these instructions fully before starting construction. 
PVA or equivalent glue will be required to stick sections together. 

Sand paper can be used to gently clean any joints. 
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and 
remember to cut away from yourself at all times. 
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in place while 
you allow glue to dry. 

 

 

 

Remove the side and internal walls from the 

sprue. 

 

Glue the

m together to form an “H” shape as shown 

above. 

 

 

Glue this to the base. 

 

 

Take the front and rear 

walls…

 

 

..and glue them into position. 

 

 

Take the four sections of steps and wall

 

Glue the steps into place as shown above. 

 

 

Then glue the wall into position. 

 

 

 
 

 

Reviews: