15mm HQ Complex
B15-MC-005
Please read these instructions fully before starting construction.
PVA or equivalent glue will be required to stick sections together.
Sand paper can be used to gently clean any joints.
A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and remember
to cut away from yourself at all times.
During the construction of this model, you may find it convenient to use pegs / elastic bands to hold pieces in place while
you allow glue to dry.
Remove the Floor and inner walls from the sprue.
Glue the walls to the base so that the etched details
face outwards (see pic)
Take the corner walls.
Glue these into place.
Glue the top ring into position.
The outer wall pieces.
These glue over the top of the inner walls so that the
doors / windows can be seen through the gaps.
(see pic above)