FROM UNIT TO THE NEAREST SURFACE
MINIMUM CLEARANCE REQUIRED
4 1/8
(105)
6 3/4
(171)
(25)
1
1
(25)
FRONT
BOTTOM
SIDE
BACK
CLEARANCES
INSTALLER MUST MEET CONDITIONS OF ACCEPTABILITY
OUTLINED BELOW UPON INSTALLATION:
1. Required installation clearances:
Wooden and Metal Installation: DO NOT install closer than
4 1/8 inches to front wall, 1 inch to back and side walls,
and 6 3/4 inches to surface below the unit.
2. Unit shall be accessible for servicing from the bottom.
3. If storage is to be used underneath the unit, it is
recommended that a baffle be placed 8 1/2 inches below
the unit to avoid contact with elevated temperatures.
4. For water and waste connections: This appliance is to be
installed to comply with the applicable federal, state or
local plumbing codes.
TO FABRICATE:
1. Lay out "cutout" dimensions on countertop and front
apron.
2. Lay out and fabricate control panel holes in counter
apron using the control box as a template.
3. Cut out holes.
TO INSTALL:
IMPORTANT - DO NOT disconnect lead wires from the
Master Control Panel when making installation.
1. Tilt and pass Control Panel and electrical box through
the countertop cutout, then through the apron cutout.
Lower modular section into countertop cutout and
position.
RECOMMENDATION: Before final seating of modular section
to countertop, apply a bead of silicone adhesive/sealant
to the underside of gasket supplied on the mounting
flange.
2. From underneath, insert screwdriver into slots in
Wellslock frame and twist ears outward (clockwise) as
required to secure flange tightly to countertop.
3. Mount Control Box to apron cutout as shown in drawing.
4. Mount Control Panel onto electrical box using the
screws supplied.
PRODUCT DIMENSIONS
CUTOUT DETAILS
ELECTRICAL
WELLS/BLOOMFIELD * VERDI, NV
MODEL HT-500AF WITH WATER FILL
INSTALLATION INSTRUCTIONS
301779-4 REV (-)
TO PLUMB:
1. A drain with valve is supplied on all units. Location of the
valve handle is at the discretion of the fabricator (see drawing).
2. Connect 1" drain connection to a suitable drain line.
3. Connect 1/4 NPT flexible water fill line to solenoid valve in
outlet box, maximum pressure 120 PSI, maximum temperature 120
°
F.
TO WIRE:
1. Final connection is accomplished by bringing proper power
supply leads (see 'WIRING REQUIREMENTS' label) through
conduit knockout to terminal block supplied within the Master
Control Panel. Check nameplates for voltage and phase.
NOTES:
BAIN MARIE STYLE HEATED TANKS ARE DESIGNED FOR WET
OPERATION ONLY.
A BACK FLOW PREVENTER IS INCORPORATED IN THE WATER FILL
LINE BETWEEN SOLENOID VALVE AND PAN. LOCAL CODES MAY
REQUIRE AN ADDITIONAL VACUUM BREAK DEVICE, NOT PROVIDED
BY WELLS.
INSTALLATION MUST MEED LOCAL PLUMBING AND ELECTRICAL
CODES.
INSTALLATION INSTRUCTIONS
DROP-IN BAIN MARIE STYLE HEATED TANK
1 INCH NPT DRAIN
WITH BALL VALVE
CONTROL PANEL WITH
FLEXIBLE CONDUIT
PHASE
AMPS
10.0
8.7
21.7
18.7
L3
L2
L1
90
°
C
90
°
C
10 AWB Cu
10 AWB Cu
21.7
25.0
15.0
13.0
6000
4500
208
240
HT-500AF
HT-500AF
RATING
FIELD WIRING GAUGE
TEMP.
SINGLE
AMPS PER LINE 3 PHASE
WATTS
VOLTS
MODEL
8 AWB Cu
8 AWB Cu
3 PHASE
1 PHASE
UNITS ARE SHIPPED THREE PHASE AND ARE FIELD CONVERTIBLE TO SINGLE PHASE
1/4 NPT WATER
FILL CONNECTION
WARMER FLANGE
GASKET
WELLSLOK
COUNTERTOP
SCREWDRIVER
MASTER CONTROL PANEL
1/4 NPT WATER
FILL CONNECTION
3 7/8
(98)
6 1/4
(159)
23 5/8
(600)
19 7/8
(505)
67 3/4
(1721)
71 1/2
(1816)
18
(457)
9 3/4
(248)
5
(127)
3 1/8
(79)
16 7/8
(429)
4 1/8
(105)
22 7/8
(581)
70 1/2
(1791)
INCHES
(MM)