background image

25 3/4

(654)

29 1/2

(749)

23 5/8

(600)

19 7/8

(505)

6 1/4

(159)

9 3/4

(248)

14

(356)

3 15/16

(100)

22 7/8

(581)

28 1/2

(724)

3 1/8

(79)

5

(127)

12 7/8

(327)

3 7/8

(98)

90

°

C

14 AWB Cu

MODEL

VOLTS

WATTS

AMPS

PHASE

WIRING

TEMP.

FIELD

GAUGE

RATING

HT-200AF
HT-200AF

240

208

1800
2400

8.7

10.0

SINGLE

SINGLE

14 AWB Cu

90

°

C

PRODUCT DIMENSIONS

CUTOUT DETAILS

ELECTRICAL

MODEL HT-200AF WITH WATER FILL

STYLE HEATED TANK

INSTALLATION INSTRUCTIONS

DROP-IN BAIN MARIE

1 INCH NPT DRAIN

WITH BALL VALVE

CONTROL PANEL WITH

FLEXIBLE CONDUIT

INSTALLER MUST MEET CONDITIONS OF ACCEPTABILITY

OUTLINED BELOW UPON INSTALLATION:

1. Required installation clearances:

Wooden and Metal Installation: DO NOT install closer than

4 1/8 inches to front wall, 1 inch to back and side walls,

and 6 3/4 inches to surface below the unit.

2. Unit shall be accessible for servicing from the bottom.

3. If storage is to be used underneath the unit, it is

recommended that a baffle be placed 8 1/2 inches below

the unit to avoid contact with elevated temperatures.

4. For water and waste connections: This appliance is to be

installed to comply with the applicable federal, state or

local plumbing codes.

TO FABRICATE:

1. Lay out "cutout" dimensions on countertop and front

apron.

2. Lay out and fabricate control panel holes in counter

apron using the control box as a template.

3. Cut out holes.

TO INSTALL:

IMPORTANT - DO NOT disconnect lead wires from the

Master Control Panel when making installation.

1. Tilt and pass Control Panel and electrical box through

the countertop cutout, then through the apron cutout.

Lower modular section into countertop cutout and

position.

RECOMMENDATION: Before final seating of modular section

to countertop, apply a bead of silicone adhesive/sealant

to the underside of gasket supplied on the mounting

flange.

2. From underneath, insert screwdriver into slots in

Wellslock frame and twist ears outward (clockwise) as

required to secure flange tightly to countertop.

3. Mount Control Box to apron cutout as shown in drawing.

4. Mount Control Panel onto electrical box using the

screws supplied.

INSTALLATION INSTRUCTIONS

1/4 NPT WATER

FILL CONNECTION

TO PLUMB:

1. A drain with valve is supplied on all units. Location of the

valve handle is at the discretion of the fabricator (see drawing).

2. Connect 1" drain connection to a suitable drain line.

3. Connect 1/4 NPT flexible water fill line to solenoid valve in

outlet box, maximum pressure 120 PSI, maximum temperature 120

F.

TO WIRE:

1. Final connection is accomplished by bringing proper power

supply leads (see 'WIRING REQUIREMENTS' label) through

conduit knockout to terminal block supplied within the Master

Control Panel. Check nameplates for voltage and phase.

NOTES:
BAIN MARIE STYLE HEATED TANKS ARE DESIGNED FOR WET

OPERATION ONLY.
A BACK FLOW PREVENTER IS INCORPORATED IN THE WATER FILL

LINE BETWEEN SOLENOID VALVE AND PAN. LOCAL CODES MAY

REQUIRE AN ADDITIONAL VACUUM BREAK DEVICE, NOT PROVIDED

BY WELLS.
INSTALLATION MUST MEED LOCAL PLUMBING AND ELECTRICAL

CODES.

WELLS/BLOOMFIELD * VERDI, NV

301779-1  REV (-)

CLEARANCES

BACK

SIDE

BOTTOM

FRONT

(25)

1

1

(25)

(171)

6 3/4

(105)

4 1/8

MINIMUM CLEARANCE REQUIRED FROM

UNIT TO THE NEAREST SURFACE

WARMER FLANGE

GASKET

WELLSLOK

COUNTERTOP

SCREWDRIVER

MASTER CONTROL PANEL

1/4 NPT WATER

FILL CONNECTION

INCHES

(MM)

Reviews: