Installation Guide
PerfectFIT Venetian Blinds
Assembling the frame
Attach the side frames to the top
and bottom by inserting the pegs on
each corner section into their
corresponding channels in the
frames. Press the pegs firmly into
place, the tension in the blind’s
cords will hold the frame together
once fully assembled.
Unpack the blind and frame (the side frames are packed separately in the same box), then lay out all the parts to ensure no cords are
tangled.
Testing the tension
Stand the assembled frame upright and raise it fully to the top. If the blind starts to
lower slightly of its own accord, the tension will need a small adjustment.
Lay the blind face down and find the small spring at the bottom of the frame, at the
back. The two ends of the cords are secured to this spring. On one side, the cord is
secured through a small eyelet with a screw. Loosen the screw, then pull through the
cord to adjust the tension. Pull the excess cord through by 5-10mm further to
increase the tension.
Stand the blind back up and retest,
making further small adjustments to
the tension if necessary.
Tighter
Looser
Locate the correct position for the brackets by holding a credit card or store card vertically
in the corner of the glass - the bracket will sit in line with the edge of the card.
Installing the brackets