
OM-1606 E V1.03
April 2, 2014
Page 14
TORINO II Freestanding 1606
INSTALLATION INSTRUCTIONS cont.
Vertical Installations
Always maintain the 1” clearance around the vent pipe (vertical), when passing through ceilings, walls, roofs,
enclosures, attic raft ers or any combustible surfaces.
DO NOT PACK AIR SPACES WITH INSULATION.
Refer to the vent chart for maximum allowable vertical and horizontal
installations.
When planning your installation determine if ceiling joists, roof raft ers
or other framing will obstruct the vent system. You may have to use 45°
elbows to navigate around any obstacles. When passing through a fl at
ceiling install a Box/Wall thimble. Cut a 10” square hole and frame as
shown in the diagram opposite.
Ensure all pipe sections are fully twist locked.
NOTE: Always check your local codes before installing venting. Necessary clearances and
requirements may vary from state to state(province to province).
Summary of Contents for TORINO II 1606
Page 7: ...OM 1606 E V1 03 April 2 2014 Page 7 TORINO II Freestanding 1606 APPLIANCE DIMENSIONS ...
Page 26: ...OM 1606 E V1 03 April 2 2014 Page 26 TORINO II Freestanding 1606 LIGHTING INSTRUCTIONS ...
Page 36: ...OM 1606 E V1 03 April 2 2014 Page 36 TORINO II Freestanding 1606 FUEL CONVERSION cont ...
Page 44: ...OM 1606 E V1 03 April 2 2014 Page 44 TORINO II Freestanding 1606 REPLACEMENT PARTS cont ...
Page 49: ...OM 1606 E V1 03 April 2 2014 Page 49 TORINO II Freestanding 1606 NOTES ...