
180-CL26.SP.1 v1.00
July 30, 2020
Page 18
CL26.SP.1
PRECAUTIONS
• The installation must conform to the installation codes.
•
This appliance needs fresh air for safe operation and must be installed so there are provisions for adequate
ventilation air. Provide adequate clearance around air openings of the appliance. Never obstruct front
openings.
•
Provide adequate clearances for proper operation and servicing of the appliance.
• This appliance must be properly connected to a venting system.
• The venting of this appliance must be installed in a location that is free of plumbing, electrical wiring and
heating or air conditioning ducts.
• Select a location that is accessible for venting.(see
“VENT TERMINATION LOCATIONS”
)
VENT TERMINATION LOCATION
• Establish a suitable vent termination location (see
“VENT TERMINATION LOCATIONS”
)
• In heavy snowfall areas make sure vent termination is located where it will not be blocked by snowfall or
snow from snow removal equipment.
• Locate vent termination away from plants, bushes, or any other object on or near the vent termination that
will interfere or obstruct the air flow around it.
• DO NOT recess vent termination into walls, sidings, or planters.
• Vent terminations located below 7 ft (2130 mm) from grade level or anywhere that it is a burn hazard to the
public, such as patios and balconies, must be protected with an approved termination cage.
INSTALLATION cont.
BACKING PANEL INSTALLATION
There is a supplied backing panel that can be used to hide gas lines, power cords etc.
• There are four magnets in the manual bag, attach the magnets as shown in (
Fig.16
) to the back legs of the
appliance.
• Place the backing panel onto the magnets as shown in (
Fig.17
), with the notches on the bottom.
Fig.16
Fig.17