Operating Instructions
EBE 350 VH
Maintenance
7.3 Repairing
As already mentioned in Chapter 5 “Initial operation” we recommend
to execute the first repair works on the machine with the help of
ISPC
Blastrac/EBE
personnel. With this your maintenance personnel gets
the opportunity to be trained intensely.
Only those repair works are described which occur within the context
of maintenance or which are required to replace wear parts.
If you replace parts yourself for specific reasons, the following
instructions and work sequence have to be observed.
You should also stock all spare or wear parts that cannot be supplied
quickly. As a rule, production standstill periods are more expensive
than the cost for the corresponding spare part.
Screws that have been removed must be replaced with those of the
same quality (strength, material) and design.
Prior to any repair works on the machine and its drives, secure the
machine against unintentional switching-on. Pull out the mains plug
in order to do this.
4
Summary of Contents for EBE 350 VH
Page 1: ...Operating Instructions EBE 350 VH MAN EBE 350VH EN...
Page 65: ...EBE 350 VH Operating Instructions Electrical systems Contents Chapter 8 8 1 Circuit diagrams 1...
Page 66: ...Operating Instructions EBE 350 VH Electrical systems 8 1 Circuit diagrams 2...
Page 88: ...EBE 350 VH Operating Instructions Spare parts Contents Chapter 10 10 1 Spare parts 1...
Page 90: ...EBE 350 VH Operating Instructions Spare parts Fig 10 1 3...
Page 93: ...Operating Instructions EBE 350 VH Spare parts Fig 10 3 6...
Page 95: ...Operating Instructions EBE 350 VH Spare parts Fig 10 4 8...
Page 98: ...EBE 350 VH Operating Instructions Spare parts Fig 10 6 11...