
Ports, LEDs, and power connectors
Chapter 2 Copper TAPs
22
rev. 1
and Link A then must use the same speed as Link B. If your link is
under test as part of a failover or redundancy arrangement, then
connect the failover device to Link B. See
3
Connect your network device (or primary device in a failover
arrangement) to Link A.
4
Connect the Analyzer ports on the TAP to the dual-receive
interface on the monitoring device.
N
OTE
: TAP
NOT
CONNECTING
If you are attempting to connect to a device with a 1000 Mb
NIC and your 10/100 TAP is not linking, this is likely due to
the auto-negotiation feature. To allow the TAP to connect,
you must force the NIC in your device to 100 Mb full duplex.
Ports, LEDs, and power connectors
This section provides a brief overview of installing the TAP and
understanding the status LEDs.
The front panel will differ slightly depending on which TAP model
you have purchased. The 10/100 (not shown) does not have the 1000
Mb speed indicator light.
Figure 5 10/100 and 10/100/1000 Copper TAP
Both power connectors are located on the back panel, along with the
model information and serial number. You can supply power to either
Summary of Contents for TS250A
Page 2: ......
Page 7: ...Chapter 1 TAPs Overview 7 rev 1 Chapter 1 TAPs Overview ...
Page 18: ...Chapter 2 Copper TAPs 18 rev 1 Chapter 2 Copper TAPs ...
Page 27: ...Chapter 3 Optical TAPs 27 rev 1 Chapter 3 Optical TAPs ...
Page 41: ...Chapter 4 Aggregator TAPs 41 rev 1 Chapter 4 Aggregator TAPs ...
Page 51: ...Chapter 5 FAQ and Troubleshooting 51 rev 1 Chapter 5 FAQ and Troubleshooting ...
Page 63: ......