
11
SCSI SWITCH (FOR AS/400
®
)
Inventory of Equipment
Before installing the SCSI Switch, make sure you have the following
components:
• SCSI Switch (for AS/400
®
)
•
SW847A:
(2) cables for connecting the Switch to the AS/400 hosts,
SW848A:
(4) cables for connecting the Switch to the AS/400 hosts
• Mounting hardware
• This user manual
If any parts are missing, contact your dealer.
Preparing the IBM 9309 Rack
WARNING
Disconnect power before servicing. You might be shocked!
The rack-mounted SCSI Switch requires 2 EIA units of vertical space.
One EIA is equal to 1.75 inches. EIA is the acronym for Electrical Industry
Association. Each EIA has a three-hole pattern for mounting rails. Remove
the rack filler panel from the location the device is to be installed in.
Mounting the SCSI Switch in the Rack
Figure 3-1
shows the EIA layout for installing the Switch in the top of a 9309
rack.
C
EIA Unit 32
A
X
B
X
EIA Unit 31
C
A
Figure 3-1. EIA Pattern Layout.