
85
CHAPTER 12: Testing and Troubleshooting
Figure 12-12. DBU Connection Test.
Test Purpose
The purpose of this test is to verify the DBU circuit and DBU modules in both
the local and remote CSU/DSU MS DBU are functioning properly.
Initiating
Follow the menu path outlined in Figure 12-13 to initiate a DBU connection test.
Figure 12-13. Initiating a DBU Connection Test.
Interpreting Test Results
If the unit is functioning properly, the CSU/DSU MS DBU displays:
DBU TEST PATTERN
TST ERR = 0000
2=TEST
1=LOCAL UNIT
2=REMOTE UNIT
3=DBU CONNECTION
1=DIAL STORED #
2=ENTER DIAL #
3=REDIAL LAST #
1=98376113
2=EMPTY
3=EMPTY
4=EMPTY
5=EMPTY
6=EMPTY
7=EMPTY
8=EMPTY
9=EMPTY
A=EMPTY