Black Box LTD5 User Manual Download Page 10

Page 10

724-746-5500   |   blackbox.com

 

Chapter 4: Configuration and Setup

Figure 4-5. Create a loop from the power cable and feed it through the hole at the 

top front of the divider. 

Figure 4-6. Insert the plug end of the wire through the loop. 

Keep the loop 
on top

Figure 4-7. Pull the cable taught to secure the loop.

Step 5.

 Wrap the remaining length of power cord around the power brick (see Figure 

4-10, page 12).

LTD5

Summary of Contents for LTD5

Page 1: ... Depot Order toll free in the U S Call 877 877 BBOX outside U S call 724 746 5500 FREE technical support 24 hours a day 7 days a week Call 724 746 5500 or fax 724 746 0746 Mailing address Black Box Corporation 1000 Park Drive Lawrence PA 15055 1018 Web site www blackbox com E mail info blackbox com Customer Support Information LTD5 LTD5B LTD8 LTD8B ...

Page 2: ...sed In This Manual Black Box and the Double Diamond logo are registered trademarks of BB Technologies Inc The Laptop Depot design is patent pending Any other trademarks mentioned in this manual are acknowledged to be the property of the trademark owners LTD5 ...

Page 3: ... Contents Table of Contents 1 0 Specifications 4 1 1 Overview 4 2 0 What s Included 5 2 1 Front and Rear Views 6 3 0 Precautions 7 4 0 Configuration and Setup 8 4 1 Installing Power Bricks on the Dividers 8 4 2 Installing the Dividers 13 LTD5 ...

Page 4: ...D8 Top 1 3 H x 20 8 W x 22 8 D 3 3 x 52 8 x 57 9 cm Body 17 H x 20 W x 22 D 43 2 x 50 8 x 55 9 cm Base 7 6 H x 20 W x 22 D 19 3 x 50 8 x 55 9 cm Casters 3 9 H 9 9 cm Drawer 5 4 H x 15 8 W x 16 D 13 7 x 40 1 x 40 6 cm Door opening 14 H x 17 W 35 6 x 27 9 cm Both Netbook Slot 12 5 H x 2 W x 17 D 31 8 x 5 x 27 9 cm Weight LTD5 Shipping 35 lb 15 9 kg LTD8 Shipping 45 lb 20 4 kg LTD5B Shipping 49 lb 22...

Page 5: ...TD5 or eight laptop capacity LTD8 Power Strip 5 outlet LTD5 or 8 outlet LTD8 Power management dividers 6 LTD5 or 9 LTD8 User s manual Pair of keys Laptop Depot Base LTD5B and LTD8B Caster base with locking drawer Laminate top 6 10 x 3 4 black particle board screws 4 10 24 x 1 5 steel screws 4 10 24 flange nuts User s manual Pair of keys LTD5 ...

Page 6: ...r Views of the Laptop Depot Side Panel Reinforced Bottom Ventilation Wire Grommet Reinforced Top Mounting Holes Stowed Door Power Management Divider PMD Figure 2 1 LTD Closed locking door Drawer Handle Locking Drawer Door Lock Casters Bottom Drawer Chassis Figure 2 2 LTDB LTD5 ...

Page 7: ...arranty For your safety it is recommended that a qualified electrician test the circuit you will be plugging the LTD into The circuit should be checked for ground integrity and appropriate branch circuit protection The LTD ground prong must be present for safe operation If the plug is damaged or if the ground prong has been removed it should be replaced by a qualified technician The use of the LTD...

Page 8: ...arate slots for the laptop computers 4 1 Installing Power Bricks on the Dividers Remove a divider to install a power brick on it Follow these steps to install the power bricks on each divider Step 1 Lay the divider flat on the work surface Lay a laptop computer and a power brick on top of the divider with the computer end of the power wire toward the top of the divider Plug the power brick into th...

Page 9: ... Figure 4 2 Then place the plug end of the wire through the loop Figure 4 3 Make sure that the loop is on the side of the divider not on top of it see Figure 4 4 This will ensure that the divider will slide back into the cart Then tighten the loop down to the divider tightening the knot Figure 4 3 Insert the plug end of the wire through the loop Keep the loop here Power brick end Figure 4 4 Make s...

Page 10: ...power cable and feed it through the hole at the top front of the divider Figure 4 6 Insert the plug end of the wire through the loop Keep the loop on top Figure 4 7 Pull the cable taught to secure the loop Step 5 Wrap the remaining length of power cord around the power brick see Figure 4 10 page 12 LTD5 ...

Page 11: ...helf or at least 21 of extra cable if the divider will be inserted into the top shelf Lower shelf 7 Upper shelf 21 Figure 4 8 Wrap the remaining electrical cable around the power brick Step 7 Hold the brick and cords in place by strapping them down using a zip tie or a hook and loop tie Strap Figure 4 9 Strap the brick and cord in place using a zip tie or hook and loop tie not included LTD5 ...

Page 12: ...nd Setup Step 8 Install the assembled divider into the cart using the following steps Figure 4 10 A divider with a power brick properly attached NOTE For proper installation make certain that all power bricks are installed on the same side of every divider LTD5 ...

Page 13: ... laptop power brick that is mounted on a divider into the farthest left open outlet and then insert the divider into the LTD Figure 4 11 Begin to insert dividers into the top row of the cart Step 2 Repeat until all dividers are installed Figure 4 12 Netbook Cart dividers with attached power bricks Step 3 Load one laptop computer into each storage bay LTD5 ...

Page 14: ...Page 14 724 746 5500 blackbox com Notes LTD5 ...

Page 15: ...Page 15 724 746 5500 blackbox com Notes LTD5 ...

Page 16: ...ack Box Black Box Network Services is your source for an extensive range of networking and infrastructure products You ll find everything from cabinets and racks and power and surge protection products to media converters and Ethernet switches all supported by free live 24 7 Tech support available in 30 seconds or less Copyright 2011 Black Box Corporation All rights reserved LTD5 rev 1 ...

Reviews: