background image

1000 Park Drive     •     Lawrence, PA 15055-1018      •     724-746-5500     •     Fax 724-746-0746

© Copyright 2008. Black Box Corporation. All rights reserved.

Figure 3. Terminating the wire conductors.

 

NOTE: For best performance, keep the untwisted part of the wire less than 0.5 inches (1.3 cm) 
long.

Using a punchdown tool, terminate each wire. Push the 110 punchdown tool to the edge 
of the 110 connector to trim the conductors. See 

Figure 3

4.  

Optional:

 Place the stuffer caps on the terminated 110 blocks for added strain relief.

5.  Finally, connect the patch cord. Plug the patch cord into the patch panel, then connect it 
to the network equipment.

Installation is complete.

TRADEMARKS USED IN THIS MANUAL

Black Box and the Double Diamond logo are registered trademarks of BB Technologies, 
Inc. 

UL is a registered trademark of Underwriters Laboratories, Inc.

All other trademarks mentioned in this manual are acknowledged to be the property of the 
trademark owners.

Reviews: