Installation
For proper operation the device must be placed in a suitable location. It should be a clean and
dry environment without direct sun light. Sufficient cooling must be possible. Do not pack or
cover the unit or set other warm equipment on top of it.
Tabletop
Just place the unit on a clean and dry place. Multiple BRI-Hub units may be stacked. The
rubber stands give enough space for proper cooling.
Wall mount
The wall assembly works as follows:
•
Drill two holes vertically, one above the other with a separation of 95 mm, into the wall
where you want to place the BRI-Hub.
•
Completely put the dowels into the drilled holes.
•
Turn the BRI-Hub screws into the dowels; with a separation of approx. 7 mm still left
between wall and screw head.
•
Now place the BRI-Hub so that the screws fit into the holes in the floor plate. The power
LED is in the upper right corner.
•
Carefully shift the BRI-Hub downward, so that the screws move into the slots inside the
floor plate.
Caution!
Don't use any excessive force. If the screws are turned too far into the dowels, the
screws may not move into the slots. Turn the screws out a little and try again.
Rack Mount
For the assembly into a rack an optional 19” front panel is needed. This may hold one or two
BRI-Hub devices. This 19”rackmount panel is available as a special from Black Box. Please
call technical support for further information. The front panel is fixed to the BRI-Hub devices
by two engine screws.
•
To do this the panel is set onto the front of the BRI-Hub.
•
The two screws are put into the holes of the panel provided for this. (Left from the NT
port and right besides the power LED.