KB-130-7
10
M20x1,5
1/4-18 NPTF
1 (HP)
M10x1,5
6
1/4-18 NPTF
5
Ø12
10
1/2-14 NPTF
9
22
491
DL
SL
23
3 (LP)
1/8-27 NPTF
M22x1,5
Ø21
21
280
330
469
75
265
848
450
44
680
145
374
427
80
11
7/16-20 UNF
12
7/16-20 UNF
16
155
24
CRII (1)
CRII (2)
2 (HP)
1/8-27 NPTF
Fig. 8: Dimensional drawing 6FTEU-35LK .. 6CTEU-50LK (representation with optional IQ MODULE and CRII)
Connection positions
1
High pressure connection (HP)
2
Connection for discharge gas temperature
sensor (HP) (for 4VE(S)-6Y ..
4NE(S)-20(Y), connection for CIC sensor
as an alternative)
3
Low-pressure connection (LP)
6
Oil drain
9
Connection for oil and gas equalisation
(parallel operation)
10
Connection for oil heating
11
Oil pressure conn
12
Oil pressure connection -
16
Connection for oil monitoring (opto-elec-
tronic oil monitoring device "OLC-K1" or
differential oil pressure switch "Delta-PII")
22
Pressure relief valve to the atmosphere
(pressure side)
23
Pressure relief valve to the atmosphere
(suction side)
24
Compressor module
SL
Suction gas line
DL
Discharge gas line
Tab. 5: Connection positions
Dimensions (if specified) may have tolerances accord-
ing to EN ISO 13920-B.
5
Line start permanent magnet motor (LSPM)
Compressors equipped with a line start permanent
magnet motor (LSPM) can be identified by the letter "L"
added to the type designation (e. g. 6CTEU-50LK or
4JTC-10LK). The built-in permanent magnets generate
a non-negligible magnetic field which, however, is shiel-
ded by the compressor housing.
Fig. 9: Warning and prohibition signs on a compressor with perman-
ent magnet motor
Safety signs attached to the compressor
WARNING
Strong magnetic field!
Keep magnetic and magnetizable objects away
from compressor!
Persons with cardiac pacemakers, implanted
heart defibrillators or metallic implants: maintain
a clearance of at least 30 cm!
Work on a compressor with LSPM motor
Any work on the compressor may only be performed by
persons that are not part of the specified group. Main-
tenance work beyond the work described in the present
document and in the Operating Instructions KB-104
may only be performed after consultation with BITZER.