S19 Pro Hydro Server Installation Guide
- 4 -
1. Overview
1.
Overview
The S19 Pro Hydro server is one of the Bitmain’s newest versions in the 19 hydro server series. Power supply APW11 is part of
S19 Pro Hydro server. All S19 Pro Hydro servers are tested and configured prior to shipping to ensure easy set up.
Caution:
1. Please refer to the layout above to place your goods in usage in case of any damage.
2. DO NOT remove any screws and cables tied on the product.
3. Please note that the actual server shall prevail.
4. There must be an external specific Surge Protection device complying with IEC/EN 61643-11 either in front of the
power supply or outside the end system (in a separate distribution box or as part of the building installation).
5. Do not plug or remove the device when it is powered on.
6. The external of the power supply shall have a disconnecting device, which can disconnect L1&L2&L3 simultaneously.
7. The S19 Pro Hydro server shall be used simultaneously with the ANTSPACE HK3. Please click
for more details of
ANTSPACE HK3.