background image

1

 

——

 

Installation and Safe Use Manual ——

 

For BA8350, BA8350S, BA9350, BA9350S, BA9350X, 

BA9350SX, PR94UZC, PR95UZC, OL835ZC, OL835ZCS, 

OL935ZC, OL935ZCS, OL935ZCX, OL935ZCSX  SYSTEMS 

 

Zip Crank Basketball Systems

 

Customer Service     

(800) 247

-

7668

 

P A R T S   L I S T 

 

Item

 

Qty

 

Description

 

Item

 

Qty

 

Description

 

A

 

2

 

Pole Section

 

Z

 

1

 

Rim and Net

 

B

 

1

 

Pole Plate

 

AA

 

1

 

Pole Cap

 

C

 

2

 

Extension Channel

 

BB

 

1

 

Height Gauge

 

D

 

1

 

Backboard "H" Frame

 

CC

 

1

 

Pointer

 

E

 

2

 

Pole Plate Bracket

 

DD

 

3

 

1/4" Flange Nut

 

F

 

2

 

Extension Channel Bracket

 

EE

 

2

 

1/4" x 1" Hex Bolt

 

G

 

8

 

Pivot Bushings

 

FF

 

1

 

Crank Handle

 

H

 

4

 

3/8" x 8" Hex Bolt

 

GG

 

TBD

 

Quick Dry Concrete (supplied by customer)

 

I

 

4

 

3/8" Thin Lock Nut

 

HH

 

1

 

Pole Padding (if applicable)

 

J

 

8

 

3/8" x 1" Hex Bolt

 

II

 

2

 

1/4” 

8” 

Carriage Bolt

 

K

 

8

 

3/8" Flat Washer

 

JJ

 

2

 

1/4” 

Wing Nut

 

L

 

8

 

3/8" Lock Washer

 

KK

 

2

 

Pre

-

Drilled Wooden Panel

 

M

 

8

 

3/8" Hex Nut

 

LL

 

8

 

1/2" Button Head Screw (Black) 

 

N

 

1

 

Crank

 

MM

 

8

 

1/2" Lock  Washer (Black)

 

O

 

2

 

1/2" x 5" Hex Bolt

 

NN

 

2

 

Pole Connector Bar

 

P

 

2

 

1/2" Thin Lock Nut

 

OO

 

1

 

5/16" Hex Key

 

Q

 

3

 

Square U

-

Bolt

 

PP

 

4

 

"J" Bolt (only on X Systems)

 

R

 

6

 

1/2" Flat Washer

 

QQ

 

4

 

Rebar (only on X Systems)

 

S

 

6

 

1/2" Lock Washer

 

RR

 

1

 

Template (only on X Systems)

 

T

 

6

 

1/2" Hex Nut

 

SS

 

12

 

5/8" Hex Nut (only on X Systems)

 

U

 

4

 

5/16" x 1" Truss Head Screw

 

TT

 

4

 

5/8" Lock Washer (only on X Systems)

 

V

 

4

 

5/16" Flat Washer

 

UU

 

8

 

5/8" Flat Washer (only on X Systems)

 

W

 

4

 

5/16" Lock Washer

 

VV

 

4

 

"J" Bolt Safety Cap (only on X Systems)

 

X

 

4

 

5/16" Hex Nut

 

WW

 

1

 

Warning Label

 

Y

 

1

 

Backboard

 

 

 

 

 

Inspect all contents prior to installation.  Report any missing parts to dealer immediately.

 

 

Read all instructions before proceeding.

 

 

Save this instruction in the event that the manufacture must be contacted in the future for maintenance information.

 

  Warning!

 

Improper installation, maintenance or use may cause product failure and serious personal injury.

 

Date:   3/10/22       Rev:   13              N.J.C.                                      File:    Publisher\Inst\BA8350.pub                                 Ref#: 920271

 

Scan for Supplemental

 

Installation and 

 

Assembly Video

 

1.     Call your local utility locating service before digging, usually by dialing 811, to avoid serious injury and service

 

        interruptions.  Also avoid lawn sprinkler lines.

 

 

2.     Determine the desired position of the pole by taking into consideration that the distance between the face of the 

 

        pole and the face of the backboard changes as the rim height is adjusted.  At the top position (official 10' rim 

 

        height) this distance is approximately 30" and at the lowest point is approximately 43".  See Figure 2A.

 

Summary of Contents for BA8350

Page 1: ...Washer RR 1 Template only on X Systems T 6 1 2 Hex Nut SS 12 5 8 Hex Nut only on X Systems U 4 5 16 x 1 Truss Head Screw TT 4 5 8 Lock Washer only on X Systems V 4 5 16 Flat Washer UU 8 5 8 Flat Washe...

Page 2: ...hen the two Pole Sections A fit tightly together Figure 1 9a Dig a 12 minimum diameter hole at least 36 deep Remove additional soil from the bottom 1 3 of the hole into a bell shape In heavy frost cli...

Page 3: ...ly at 110 from the playing surface plumb in both directions and with the front face parallel to the playing surface See Figure 2A 16a Filling the inside of the pole assembly with wet Premix Concrete G...

Page 4: ...with additional soil removed from the bottom 1 3 will require approximately twenty 60 lb bags of Premix Concrete GG Allow for more if the hole is deeper or wider Make sure you have enough concrete on...

Page 5: ...t is a good idea to have the concrete mixture be medium wet This will increase your working time and allow batches to mix in the hole Pour the hole full to ground level Insert the broomstick into the...

Page 6: ...e base of the pole assembly over the J Bolts PP Place 5 8 Flat Washers UU 5 8 Lock Washers TT and 5 8 Hex Nuts SS on J Bolts PP above the pole base to tighten base down You can level pole if needed by...

Page 7: ...of the Extension Channels C Do not tighten at this time See Figure 6 25 Using the three Square U Bolts Q 1 2 Flat Washers R 1 2 Lock Washers S and 1 2 Hex Nuts T attach the Pole Plate B to the pole a...

Page 8: ...annel C with the previously attached Extension Channel Brackets F to the top of the Pole Plate B See Figure 8 28 Install the Crank N to the Pole Plate Brackets E and the Extension Channel Brackets F p...

Page 9: ...ts are free by loosening the lock nuts 31 Using the Crank Handle FF lower the Backboard H Frame D to its lowest position Carefully position the Backboard Y resting on the front of the Backboard H Fram...

Page 10: ...through the mounting holes in the Extension Channel C and tighten with the remaining 1 4 Flange Nut DD You must tighten the 1 4 Flange Nuts DD against each other to lock this assembly in place if you...

Reviews: