The following schedule lists the tasks that must be performed at each Service.
Note: The service schedule is subject to change; contact the local Bioquell Service
Provider for latest details.
The approximate time the unit is out of commission is 1 to 2 days.
6.2.1
Parts to be replaced
General examination and replacement of any broken or damaged parts
Replacement of H
2
O
2
sensor head with a new pre-calibrated head
Replacement of RH Sensor and Temperature Sensor with pre-calibrated
sensors
Replacement of Carbon and HEPA filters (ceiling aeration unit) – every 2
years
6.2.2
Functional Checks
Door Seal Pressure Check
E-stop & Internal Emergency Door Release Check
Pressure switch check (ceiling aeration unit)
Airflow checks
Air particulate test (if applicable)
Function check
The HPV Generator will require servicing on an annual basis at the same time.
Refer to Generator User Manual for service tasks.