HANDRAIL INSTALLATION PROCEDURE FOR GAIT TRAINER 3
INSTALLATION AND ASSEMBLY
950-428
950-429
FN: 19-228 6/19
Page 1: ...HANDRAIL INSTALLATION PROCEDURE FOR GAIT TRAINER 3 INSTALLATION AND ASSEMBLY 950 428 950 429 FN 19 228 6 19...
Page 2: ...e Biodex website www biodex com If the desired information is not found please feel free to contact a local distributor or Biodex directly at supportservices biodex com Thank you Biodex Medical System...
Page 3: ...larger holes in the mounting bar should face out 3 Slide a 1 75 screw through the tube wall of the handrail and mounting bar 4 Slide the end of the handrail onto the mounting hub Thread a 0 75 screw t...
Page 4: ...4 Figure 1 1 Gait Trainer 3 comes with a Factory Installed Support Bar Figure 1 2 Optional Extended Handrails Installed...
Page 5: ...5 Figure 1 3 Optional Geriatric Pediatric Handrails...
Page 6: ...oint for waste separation Properly dispose of the device at the end of its service life The device packaging is disposed of through resource recycling The metal parts of the machine go to scrap metal...
Page 7: ...7...
Page 8: ...8...