D.
STARTING UP
1
Check that the reactor BIO-UV is properly mounted on your installation.
2
Start your installation to fill the pipes with water.
3
Purge the air of the reactor:
- close the valve upstream of the reactor,
- unscrew the drain plug on the top of the body reactor,
- open the valve upstream of the reactor slowly and close it when the water is
forced out through the drain plug,
- re-tighten the drain plug and open the valve upstream of the reactor.
4
Check the water tightness of the unit.
5
Check
that the electrical connection of the UV unit is compliant.
Check
that the top of the reactor is correctly positioned.
6
Set the ON/OFF UV unit switch to the ON position and check that the lamps
are working properly: the indicator light for each lamp should be lit.
7
Check that the hour counter is running.