![BIO RAD ZE5 User Manual Download Page 100](http://html.mh-extra.com/html/bio-rad/ze5/ze5_user-manual_2753184100.webp)
Chapter 4 Everest Software
Button
Function
Door Toggle
— indicates position of the loader door. Clicking this button
opens and closes the loader door as long as the system is not actively
acquiring.
Temperature Control
— displays the current temperature of the loader.
The button enables/disables temperature control of the loader. The
temperature can be set between 4–37°C in 1° increments.
If a temperature is set in the Experiment Builder for a particular
experiment, that value overrides any previous number set in the Home
window.
Table 29. System buttons and their functions, continued
Other Toolbar Buttons
Buttons in the toolbar vary depending on the stage of experiment setup and the selected tab.
n
For information about buttons for reports, see
.
n
For information about toolbar buttons in the Analysis tab, see
n
For information about toolbar buttons in the Publish tab, see
98 | ZE5 Cell Analyzer and Everest Software
Summary of Contents for ZE5
Page 1: ...ZE5 Cell Analyzer and Everest Software User Guide Version 2 0 ...
Page 2: ......
Page 3: ...ZE5 Cell Analyzer and Everest Software User Guide Software Version 2 0 ...
Page 14: ...Table of Contents xii ZE5 Cell Analyzer and Everest Software ...
Page 50: ...Chapter 2 Hardware Description 48 ZE5 Cell Analyzer and Everest Software ...
Page 82: ...Chapter 4 Everest Software 80 ZE5 Cell Analyzer and Everest Software ...
Page 84: ...Chapter 4 Everest Software 82 ZE5 Cell Analyzer and Everest Software ...
Page 92: ...Chapter 4 Everest Software 90 ZE5 Cell Analyzer and Everest Software ...
Page 104: ...Chapter 4 Everest Software 102 ZE5 Cell Analyzer and Everest Software ...
Page 109: ...Managing Users 9 Click OK to save the new user account User Guide 107 ...
Page 120: ...Chapter 5 Configuring the System 118 ZE5 Cell Analyzer and Everest Software ...
Page 125: ...Working with Optical Filter Configurations User Guide 123 ...
Page 126: ...Chapter 5 Configuring the System 124 ZE5 Cell Analyzer and Everest Software ...
Page 177: ...Setting Up the Run List User Guide 175 ...
Page 191: ...Setting Up the Run List User Guide 189 ...
Page 276: ...Chapter 7 Creating Experiments and Workspaces 274 ZE5 Cell Analyzer and Everest Software ...
Page 295: ...Setting Up the Experiment 6 Set up samples User Guide 293 ...
Page 333: ...Decontaminating the System User Guide 331 ...
Page 392: ...Appendix F References 390 ZE5 Cell Analyzer and Everest Software ...
Page 397: ......