KBF / KBF P (E5.2) 02/2012
page 23/103
3.3 Storage
Intermediate storage of the unit is possible in a closed and dry room. Observe the guidelines for tempo-
rary decommissioning (chap. 17.2).
Permissible ambient temperature range during storage:
•
If the steam humidifying system has NOT been emptied: +3 °C /
37.4 °F
to +60 °C /
140 °F
.
•
After BINDER Service has emptied the steam humidifying system: -10 °C /
14 °F
to +60 °C /
140 °F
With temperatures below +3 °C /
37.4 °F
, water must be completely removed from the humidifying sys-
tem.
CAUTION
Storage below +3 °C / 37.4 °F with filled steam humidifying system.
Freezing in the steam generator.
Damage to the unit.
Contact BINDER Service before any transportation below +3 °C /
37.4 °F
.
Permissible ambient humidity: max. 70 % r.H., non-condensing
CAUTION
Condensation by excess humidity.
Danger of corrosion on the housing after operating at humidity values > 70 % r.H. for
a long period.
Dry the appliance completely before shut-down:
•
Set the humidity to 0 % r.H. and turn on humidity switch (4).
•
Set the temperature set point to 60 °C /
140 °F
for approx. 2 hours (Manual mode).
•
Only then, shut down the unit at the main power switch (3) and close the tap of the
water supply.
When after storage in a cold location you transfer the unit to its warmer installation site, condensation may
form. Before start-up, wait at least one hour until the chamber has attained ambient temperature and is
completely dry.
In case of a prolonged temporal decommissioning: Leave the unit door open or remove the access port
plugs.
3.4 Location of installation and ambient conditions
Set up the climatic chamber on a flat, even surface, and in a well-ventilated, dry location and align it using
a spirit level. The site of installation must be capable of supporting the unit’s weight (see technical data,
chap. 19.4). The chambers are designed for setting up inside a building (indoor use).
CAUTION
Danger of overheating.
Damage to the unit.
∅
Do NOT set up unit in non-ventilated recesses.
Ensure sufficient ventilation for dispersal of the heat.
Summary of Contents for KBF 115 (E5.2)
Page 5: ...KBF KBF P E5 2 02 2012 page 5 103 Product registration ...
Page 98: ...KBF KBF P E5 2 02 2012 page 98 103 19 7 Dimensions KBF 115 ...
Page 99: ...KBF KBF P E5 2 02 2012 page 99 103 19 8 Dimensions KBF 240 KBF P 240 ...
Page 100: ...KBF KBF P E5 2 02 2012 page 100 103 19 9 Dimensions KBF 720 KBF P 720 ...